Apollo 14 Activation Checklist

Last revised 8 September 2006.

 

We currently have versions with dates of 15 September 1970 and 18 December 1970. The latter is believed to be the flown version.

 

18 December 1970 date
presumed to the flown version.

PDF document ( 1.6Mb PDF ) prepared by Lennie Waugh and David Woods from a microfilm copy provided by Kent Carter of the U.S. National Archives.

 

15 September 1970 date

Scanned by Frank O'Brien.

 

Title Page ( 18k )

Signature Page ( 12k )

Page iii - Contents ( 15k )

Page iv - Contents (cont.) ( 9k )

Page Trans Lunar Coast CSM-LM Transfer ( 5k )

Page 1-1 Intravehicular Transfer (IVT) - 1 Checklist ( 7k )

Page 1-2 IVT to LM Entry Status Check ( 5k )

Page 1-3 Initial Activation Circuit Breaker Configuration Panel 11 (CDR) ( 11k )

Page 1-4 Initial Activation Circuit Breaker Configuration Panel 16 (LMP) ( 9k )

Page 1-5 Initial Activation Checklist ( 7k )

Page 1-6 Initial Activation Checklist ( 10k )

Page 1-7 Initial Activation Checklist ( 10k )

Page 1-8 Initial Activation Checklist ( 7k )

Page 1-9 Initial Activation Checklist ( 8k )

Page 1-10 Initial Activation Checklist ( 9k )

Page 1-11 Initial Activation Checklist - Housekeeping ( 10k )

Page 1-12 Initial Activation Checklist - Housekeeping ( 7k )

Page 1-13 Initial Activation Checklist - Comm Activation ( 10k )

Page 1-14 Initial Activation Checklist - Comm Activation ( 9k )

Page 1-15 Initial Activation Checklist S-Band/VHF Simplex Voice Check ( 9k )

Page 1-16 Initial Activation Checklist ( 7k )

Page 1-17 Initial Activation Checklist OPS Checkout and Comm Deactivation ( 7k )

Page 1-18 Initial Activation Checklist IVT to CSM ( 8k )

Page 1-19 CSM to LM Transfer List (PDI) ( 7k )

Page 2-1 LMP IVT to LM ( 8k )

Page 2-2 CDR IVT to LM and EPS Activation ( ( 9k )

Page 2-3 EPS Activation ( 10k )

Page 2-5 Caution and Warning Checkout ( 8k )

Page 2-6 ECS Activation and Checkout ( 6k )

Page 2-7 CDR and LMP Connect to LM ECS ( 7k )

Page 2-8 Activation Power Up Circuit Breaker Configuration Panel 11 (CDR) ( 10k )

Page 2-9 Activation Power Up Circuit Breaker Configuration Panel 16 (LMP) ( 9k )

Page 2-10 Talkback Verification ( 7k )

Page 2-11 PGNS Activation/Test, VHF B Checkout ( 9k )

Page 2-12 PGNS Activation/Test, VHF A Checkout ( 8k )

Page 2-13 Communications Checks ( 9k )

Page 2-14 S-Band Steerable Antenna Activation ( 8k )

Page 2-16 IMU Calibration/Alignment, Suit Fan/H2O Ck ( 13k )

Page 2-17 IMU Calibration/Alignment, Suit Fan/H2O Ck ( 11k )

Page 2-18 LGC/CMC Clock Sync, Time of Ephemeris Update ( 6k )

Page 2-19 Time of Ephemeris Update, Ascent Battery Act & Ck ( 12k )

Page 2-20 Set Digital Autopilot, Ascent Battery Act and Ck (con't) ( 8k )

Page 2-21 Landing Gear Deploy, RCS Pressurization ( 10k )

Page 2-22 RCS Pressurization (con't) ( 11k )

Page 2-23 RCS Checkout ( 9k )

Page 2-24 RCS Checkout (con't) ( 10k )

Page 2-25 RCS Checkout (con't) ( 10k )

Page 2-26 IMU Fine Alignment and MSFN Uplink/Update ( 10k )

Page 2-27 Secure Hatch, AGS Activation and Checkout ( 14k )

Page 2-28 AGS Activation (con't) ( 7k )

Page 2-29 AGS Activation (con't) ( 6k )

Page 2-30 Communications Setup ( 8k )

Page 2-31 PGA Pressure Integrity Checks ( 11k )

Page 2-32 Regulator Check ( 11k )

Page 2-33 Regulator Check (con't) ( 7k )

Page 2-34 Drift Check/Rate Gyro Check ( 9k )

Page 2-35 Rendezvous Radar Checks/AGS Update and Align ( 12k )

Page 2-36 Rendezvous Radar Checks/AGS Calibration ( 12k )

Page 2-37 Rendezvous Radar Checks/AGS Calibration (con't) ( 14k )

Page 2-38 Rendezvous Radar Checks (con't) ( 8k )

Page 2-39 Prep for Undocking ( 10k )

Page 2-40 Prep for Undocking (con't) ( 7k )

Page 2-41 CDR Undocking Circuit Breaker Configuration ( 10k )

Page 2-42 LMP Undocking Circuit Breaker Configuration ( 9k )

Page 2-43 Prep for Undocking (con't) ( 6k )

Page 2-44 Prep for Undocking (con't) ( 59k )

Page 2-45 Undocking ( 5k )

 