Library
 

 
  AEROSPACE TECHNOLOGY CONTRACTED STUDIES

NASA acquires Aerospace Technology Studies to support Enterprise planning at NASA Headquarters. The following studies were completed under NASA Contract NASW-4967 with Science Applications International Corporation, Technology Services Company, Arlington, Virginia.

Document Listing

Task 104--Alternative Models for Analyzing NASA Aeronautical Technology Investments
Long-Term R&D Project Selection (HERTZFEL.DOC)

Applying Options Analysis Techniques to Research and Development Projects (NASAPAPR.DOC)

A Conceptual Model for Determining the Highest Potential Payoff Areas for NASA Aeronautics Investments (REVDTEXT.DOC)
Task 201--Scenario-based Strategic Planning for NASA Aeronautics Enterprise
and
Task 208--Scenario-based Strategic Planning for the Office of Aero-Space Technology

LIST_DOC.PDF Preliminary Findings of the NASA Scenario Interviews

Workshop to Develop Long-Term Global Aeronautics Scenarios

Environmentally Challenged Scenario Parameters
Parts: 1 | 2 | 3 | 4 | 5 | 6 | 7

Regional Tensions Scenario Parameters
Parts: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Grounded Scenario Parameters
Parts: 1 | 2 | 3 | 4 | 5 | 6 | 7

Pushing the Envelope Scenario Parameters
Parts: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10

Trading Places Scenario Parameters
Parts: 1 | 2 | 3 | 4 | 5 | 6

Matrix Showing the Rating of Needs & Opportunities Across the World

Scenario Interview Answers
Task 209--Customer Satisfaction Survey
NASA Customer Survey (Draft Report--2d.doc)

1998 Customer Survey: Aeronautics and Space Transportation Technology (209Sum_1.ppt)

NASA Customer Survey - SAIC (DO209_5.ppt)
Task 210--Environmental Compatibility Research Workshops
Report on the NASA Environmental Compatibility Workshops Conducted for NASA Contract: NASW-4967 (Final Report.doc) Task 213--Information Technology Program-Strategic Goal Contribution
Information Technology Program Strategic Goal Contribution (213Final Report.doc) Task 216--Program Management Assessment Processes
NASA Program Assessment Process Study (Report Herb.doc) Task 221--Time Required to Mature Aeronautical Technologies to Operational Readiness
Case Studies: Time Required to Mature Aeronautic Technologies to Operational Readiness (Final Report.doc)

Appendix B--Surveys.doc
Task 222--Independent Assessment of Aeronautical Technology Investment Trends
History of T&T Data Comments on the Tourism and Travel Report and Projections (T&Treport1.doc)

Travel_Presentations.ppt



 
 

NASA Headquarters Responsible Official: Code R   |    Curator: SAIC   |    SITE MAP
NASA Privacy Statement, Disclaimer, and Accessibility Certification
artist concept of a future airplane