|
- Process Flow (Presentation)
Waiver/Exception Requirements [NPR 8715.3C paragraph 1.13]
- Interim SMA TA Waiver Request Form
NASA Safety and Mission Assurance Technical Authority Mandatory Standards for Constellation Program
Sorted by Called Standard
Sorted by Directive Citing a Called Standard
Constellation Program Applicability & Traceability Study
[All Requirements Used as of March 31, 2008]
- Letter from Chief, Safety and Mission Assurance to Associate Administrator for Exploration Systems Mission Directorate
Full Letter [large file: >5 meg 155 pages]
- Agency Level
Documents Used Currently Applicable Requirements
Sorted by Agency doc [PDF] [MS_XLSl]
Sorted by CxP70059 [PDF] [MS_XLS]
Sorted by Other CxP Docs [PDF] [MS_XLS]
- Future Applicable Requirements
Sorted by Agency Doc [PDF] [MS_XLS]
- Indirectly Applicable Requirements
(Requirements placed from Agency to Center then on Programs/Projects at their Centers)
Sorted by Agency Doc [PDF] [MS_XLS]
- Not Applicable Requirements
(exception granted by Chief, SMA letter of May 5, 2008)
Sorted by Agency Doc [PDF] [MS_XLS]
- For documents and SMA Requirements not controlled by OSMA
*Note: Full determination needs to be made by controlling technical authority*
Applicable Requirements [PDF] [MS_XLS]
Not Applicable Requirements [PDF] [MS_XLS]
- SMARTS (SMA Requirements Tracking System)
Access
July 31, 2008
|