Follow this link to go to the text only version of nasa.gov
HQ Facilities and Adminstrative Services Division
HQOPS HOME
FASD HOME
NASA HQ SAFETY PROGRAM
NASA HQ EMERGENCY MANAGEMENT PROGRAM
CONFERENCE FACILITIES AND SERVICES
PARKING AND FARE SUBSIDY PROGRAMS
TRANSPORTATION
GUARANTEED RIDE HOME
ORGANIZATIONAL CONTACT LIST
MAIL MANAGEMENT
OCCUPATIONAL HEALTH PROGRAMS
FACILITIES MANAGEMENT
HEADQUARTERS SECURITY OFFICE
VISITOR ACCESS PROCEDURES
NASA HQ PANDEMIC PREPAREDNESS
NASA HQ WORKPLACE VIOLENCE PROCEDURES


 

HQ Facilities and Administrative Services Division

New Office Lighting


photo of Ceiling light override switchOffice Lighting:
The Lutron Lighting system provides each office individually controlled overhead lighting as well as an infra-red sensor. Each private office is equipped with an infra-red sensor that will activate lighting upon entering the office and will automatically turn lights off after 15 minutes after exiting. The dimmer switch is user friendly and can be easily adjusted for personal preference. Each dimmer switch is programmed by office and will only work for the assigned office.

Open Office/Corridor Lighting:
The open office and corridor lighting are continuously lit during core lease hours of 6 am – 6 pm. At 6 pm the overhead lighting will blink for 10 minutes prior to shut off. Override switches are located at the east, center, and west end of the building and must be pressed if this occurs while employees are in the building. Due to LEED requirements the maximum amount of time the lights can stay on after hours is 30 minutes once activation of the override switch occurs.

If at any time employees experience concerns regarding the lighting system, a Facilities Help Desk ticket should be submitted and the floor facility manager and our Occupational Health and Safety manger will conduct readings to be sure lighting is at an acceptable level.

Image fno ew light switch: Top button-Press and hold lights brighten to full intensity, Raise button-press and hold to increase intensity, lower button-press and hold to decrease intensity, bottom button-press and hold lights dim then go off.

< Back to Building Renovation Home




+ USA.gov - The U.S. government's official web portal.
+ Budgets, Strategic Plans and Accountability Reports
+ The President's Management Agenda
+ Privacy Policy and Important Notices
+ Inspector General Hotline
+ Equal Employment Opportunity Data Posted Pursuant
to the No Fear Act

+ Information-Dissemination Priorities and Inventories
NASA - National Aeronautics and Space Administration
NASA Official: Rose Butler
+ Site Curator
+ Division Contacts