Atmospheric pressure |
1000 millibars |
10 - 80 millibars |
|
Gaseous composition: |
||
|
oxygen |
20.0% |
< 00.1% |
|
carbon dioxide |
0.03% |
5 - 30% |
|
nitrogen |
78.0% |
60 - 95% |
|
|
||
|
Water vapor |
3 g cm2 |
2x10-3 g cm2 |
[61] On Mars, surface temperatures overlapped the range on Earth. At some latitudes, daily highs of +30°C had been measured, and ranges of 100° within a 4-hour period were not unknown. 27
|
|
|
|
|
|
|---|---|---|---|---|
|
|
||||
|
Vidicon microscope |
|
? |
? |
? |
|
|
|
|
|
|
|
|
|
Double present funding.
|
|
Multivator |
Science-functional feasibility. |
? |
Sufficient available. |
Sufficient available. |
|
Device-conceptual. |
1 Sept. 1963 |
Sufficient available. |
$10 000 for development of Mark 11. $200 000 for flight hardware. |
|
|
Minivator |
Science-none. |
- |
- |
- |
|
Device-flight-sized breadboard. |
Now |
|
|
|
|
Advanced bread-board demonstrated. Ready to start work on prototype. |
With proper funding and interface definition, 1 yr from contract award. |
10 persons required in engineering area
|
Between $250 000 and $350 000, depending on required experiment configuration |
|
Optical rotation |
Some functional feasibility demonstrated. |
14 mos from contract start. |
- |
$274 652 |
|
"J" band |
Science-functional feasibility. |
1 Aug. 1963. |
|
$100 000 |
|
|
Device-conceptual. |
1 Aug. 1964 for flight prototype. |
8-10 persons 1 yr. |
$300 000-400 000 |
|
Gas chromatograph |
Feasibility breadboard. |
Nov. 1964. |
Additional: 4 engineers and 5 technicians. |
$425 000 |
|
Mass spectrometer |
Conceptual. |
May be ready 1966 launch date. |
2 assistants for Dr. Biemann and services of Consolidated Systems Corp. |
$350 000 |
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|
|
|
|
|||||
|
Vadicon microscope |
Data rate requirements demand power available only with much larger boosters. Development of sample handling, methods for discrimination of biologicals requires more work. |
|
|
10 |
Not defined |
Yes |
|
Wolf trap |
1.1-2.3 |
2460 - 3280 |
0.25/1 |
10-hr minimum |
Yes |
|
|
Multivator |
|
1.4 |
1558 |
0.5/3-5 |
Days-week |
Yes |
|
Minivator |
Science input lacking; accommodation similar to Multivator. |
2.3 |
Not defined |
1-2/5-10 |
2 weeks |
Yes |
|
Gulliver |
- |
3.2 - 5.4 |
4920 - 9840 |
2-3/4-5 |
Not defined |
Yes |
|
Optical rotation |
- |
2.4 |
2132 |
0.5/1.1 |
Not defined |
Yes |
|
"J" band |
Sample acquisition and handlin,g development not begun. |
Not defined |
Not defined |
2-3/10 |
Weeks |
Yes |
|
Gas chromatograph |
- |
3.04 |
3280 |
?/14.5 |
Not defined |
Yes |
|
Mass spectrometer |
|
- |
- |
- |
- |
- |