PART 1848
VALUE ENGINEERING
TABLE
OF CONTENTS
SUBPART 1848.1 POLICIES AND PROCEDURES
1848.102 Policies.
1848.103 Processing
value engineering change proposals.
1848.104 Sharing
arrangements.
1848.104-3 Sharing collateral
savings.
SUBPART 1848.2 CONTRACT CLAUSES
1848.201 Clauses for
supply or service contracts.
PART
1848
VALUE ENGINEERING
Subpart 1848.1--Policies and Procedures
1848.102 Policies.
(a)
The Assistant Administrator for Procurement (Code HS) is the approval authority
for exemptions.
(f)
In calculating instant or future contract savings on firm-fixed-price contracts
when the parties have not set out a specific figure for profit, the contracting
officer shall use the total contract price as the basis for calculating the
savings.
1848.103
Processing value engineering change proposals.
(a)
Upon receipt of a VECP, the contracting officer shall promptly forward it to
the technical officer responsible for the contract with the following
information:
(i)
Date of VECP receipt;
(ii)
Date for notifying the contractor of VECP acceptance or rejection;
(iii)
Notification of the potential for awarding concurrent, future, or collateral
savings to the contractor if the VECP is accepted;
(iv)
Request for a technical evaluation, with complete rationale for recommended
acceptance or rejection, to include if acceptance is recommended:
(A)
An estimate of the type of savings, Government costs, etc., that can be
expected from its acceptance;
(B) A
procurement request setting forth the specification changes to be used in any
contract modification accepting the VECP in whole or in part; and
(C) Additional
funds if acceptance of the VECP results in negative instant contract savings.
(v) Technical
evaluation due date.
1848.104 Sharing arrangements.
1848.104-3
Sharing collateral savings.
(a) The contracting officer is authorized to
make the determination that the cost of calculating and tracking collateral
savings will exceed the benefits to be derived.
Subpart 1848.2--Contract Clauses
1848.201
Clauses for supply or service contracts.
(a)(6)The
Assistant Administrator for Procurement (Code HS) is the approval authority for
exemptions.
(b)
The contracting officer shall not insert the clause at FAR 52.248-1,
Value Engineering, either with or without its Alternates, in an R&D
contract where the statement of work is essentially an incorporation by
reference of the prospective contractor's proposal. If any other part of the
statement of work in such a contract reflects a Government specification that
might benefit from application of VE techniques, the contracting officer shall
consider inserting the VE incentive clause at FAR
52.248-1 with any applicable Alternate(s), and establish the
applicability of the clause to that part.
(c)
Except as prescribed in paragraph (b) of this section, the contracting officer
shall insert the clause at FAR
52.248-1 with its Alternate I in initial production contracts for major
systems, and major systems R&D contracts for full-scale development, unless
the contracting officer determines in writing that its use is inappropriate.
Use of Alternate I is appropriate for an R&D major systems contract only if
the contract specifications contain detailed requirements that lend themselves
to VE.
(d)
The contracting officer shall insert the clause at FAR
52.248-1 with its Alternate II under the conditions prescribed in
paragraph (c) of this section.