Cancelled by PIC 99-15

 

NASA logo

 

PIC 98-13

Procurement Information Circular


July 14, 1998

EXTENSION OF CLASS DEVIATION FROM FAR PART 45

PURPOSE: To extend the class deviation to FAR Part 45 adopted in PIC 98-4.

BACKGROUND: The Department of Defense (DOD) is sponsoring an initiative to rewrite FAR Part 45, Government Property, to improve its clarity and minimize imposed burdens. DOD initially approved a deviation on July 14, 1995, as an interim measure to reduce property recordkeeping and physical inventory requirements for low value property. This deviation was subsequently extended on June 20, 1997, and again on June 30, 1998. NASA adopted the initial DOD deviation through PIC 95-8, dated October 11, 1995, and the first extension through PIC 98-4, dated February 5, 1998.

GUIDANCE: The class deviation provided in PIC 98-4 is extended. A copy of the June 30, 1998 DOD extension is enclosed (the changed FAR language is identical to that in PIC 98-4). This deviation is mandatory for all solicitations issued after receipt of this PIC, except solicitations for contracts performed entirely, or in substantial part, on NASA installations. In these cases, the deviation may be used at the contracting officer's discretion. Existing contracts may be modified to incorporate the provisions of the deviation only if adequate consideration is obtained. There is no change to the NASA FAR Supplement as a result of this deviation.

CANCELLATION: This PIC supersedes PIC 98-4.

EFFECTIVE DATE: To ensure continuity of effectivity from the expiration date of PIC 98-4, this PIC is effective July 14, 1998, and shall remain in effect until FAR Part 45 is revised to include the provisions in the deviation.

HEADQUARTERS CONTACT: Tom O'Toole, Code HK, (202) 358-0478.

Tom Luedtke

Acting Associate Administrator for Procurement

Enclosure

Attachment