PURPOSE: To provide guidance on administering progress payments on indefinite-delivery contracts; delete outdated performance-based payments guidance; and provide guidance on using performance-based payments in competitive negotiated acquisitions. This PN also makes changes to NFS Parts 1804, 1806, and 1823 to conform the NFS with changes made by FAC 97-15; and makes editorial corrections and miscellaneous changes dealing with NASA internal and administrative matters.

BACKGROUND: FAC 97-16 simplified and streamlined the administration of progress payments, and removed the prohibition against using performance-based payments in contracts for research and development and contracts awarded through competitive negotiation procedures. This PN states that administration of progress payments under indefinite delivery contracts can be on either an overall contract basis, or a group of orders as a single unit. This PN also specifies that contracting officers should consider the procedural and small business competitiveness factors when determining the practicality of the use of performance-based payments in competitive negotiations and advises contracting officers to consider qualitative evaluation methods when performance-based payments are used in competitive negotiations under $50M. As a management control to ensure that the source selection process and small business competitiveness are not adversely affected, HQ approval is required for use of performance-based payments in competitions under $50M. When performance-based payments are planned to be used in competitive negotiated acquisitions, the draft RFP must request the potential offerors to suggest terms, including performance events or payment criteria. The information provided by the offerors will be used, when possible, to establish a common set of performance-based payment parameters in the formal solicitation. Other editorial changes to correct referenced FAR citations, office designations; and provides an example of "evidence of endorsement by another agency of the U.S. Government based on national security or foreign policy of the United States" at section 1845.405-70.

REGULATION: Changes are made in Parts 1804, 1806, 1815, 1823, 1832, and 1845 as set forth in the enclosed replacement pages.

REPLACEMENT PAGES: You may use the enclosed pages to replace 4:1, 4:2, 4:7, 4:8, 6:3, 6:4, 15:3, 15:4, 15:4.1, Part 23, Part 32, 45:7, 45:8, 45:9, and 45:10.

REGULATORY COMPLIANCE: This PN was published as a final rule in the Federal Register (65 FR 31101 - 31103, May 16, 2000).

EFFECTIVE DATE: This PN is effective as dated and shall remain in effect until canceled or superseded.

HEADQUARTERS CONTACT: Joe Le Cren, NASA Headquarters, Code HK, Washington, DC 20546, (202) 358-0444, email: jlecren@hq.nasa.gov.

  

R. Scott Thompson
Director, Contract Management Division

Enclosures


 PART 1804
ADMINISTRATIVE MATTERS

TABLE OF CONTENTS

SUBPART 1804.1 CONTRACT EXECUTION

1804.103 Contract clause.

1804.170 Contract effective date.

SUBPART 1804.2 CONTRACT DISTRIBUTION

1804.202 Agency distribution requirements.

1804.203 Taxpayer identification information.

SUBPART 1804.4 SAFEGUARDING CLASSIFIED INFORMATION WITHIN INDUSTRY

1804.402 General.

1804.404-70 Contract clause.

1804.470 Security requirements for unclassified automated   information resources.

1804.470-1 Scope.

1804.470-2 Policy.

1804.470-3 Security plan for unclassified Federal Information Technology systems.

1804.470-4 Contract clauses.

SUBPART 1804.5 ELECTRONIC COMMERCE IN CONTRACTING

1804.570 NASA Acquisition Internet Service (NAIS).

1804.570-1 General.

1804.570-2 Electronic Posting System.

SUBPART 1804.6 CONTRACT REPORTING

1804.601 Record requirements.

1804.602 Federal Procurement Data System.

1804.670 Individual Procurement Action Report (NASA Form 507 series).

1804.670-1 Applicability and coverage.

1804.670-2 Submission due date.

1804.670-3 Preparing Individual Procurement Action Reports (NASA   Forms 507, 507A, 507B, 507G, and 507M).

1804.671 Committee on Academic Science and Engineering (C.A.S.E.) Report.

SUBPART 1804.8 GOVERNMENT CONTRACT FILES

1804.802-70 Handling of classified material.

1804.803 Contents of contract files.

1804.803-70 Checklist.

1804.804 Closeout of contract files.

1804.804-2 Closeout of the contracting office files if another office administers the contract.

1804.804-5 Procedures for closing out contract files.

1804.805 Storage, handling, and disposal of contract files.

1804.805-70 Review, separation, and retirement of contract files.

SUBPART 1804.9 TAXPAYER IDENTIFICATION NUMBER INFORMATION

1804.904 Reporting payment information to the IRS.

SUBPART 1804.70 TRANSFER OF CONTRACTING OFFICE RESPONSIBILITY

1804.7000 Scope of subpart.

1804.7001 Definition.

1804.7002 Approval of Transfer Requests.

1804.7003 Responsibilities of the contracting officer of the transferring installation.

1804.7003-1 Coordinations.

1804.7003-2 File inventory.

1804.7003-3 Notifications.

1804.7003-4 Transfer.

1804.7003-5 Retention documentation.

1804.7004 Responsibilities of the contracting officer of the receiving installation.

1804.7004-1 Pre-transfer file review.

1804.7004-2 Post-transfer actions.

SUBPART 1804.71 UNIFORM ACQUISITION INSTRUMENT IDENTIFICATION

1804.7100 Scope of subpart.

1804.7101 Policy.

1804.7102 Prefixes.

1804.7103 Serial numbers.

1804.7104 Modifications of contracts or agreements.

SUBPART 1804.72 REVIEW AND APPROVAL OF CONTRACTUAL INSTRUMENTS

1804.7200 Contract review by Headquarters.

SUBPART 1804.73 PROCUREMENT REQUESTS

1804.7301 General.


1804.802-70 Handling of classified material.

When a contract is unclassified, classified material relating to that contract shall be maintained in a separate file folder and container, and the unclassified folder shall be marked to indicate the location of the classified material. The front and back of each folder containing classified material shall be marked with the highest classification assigned to any document in the folder.

1804.803 Contents of contract files.

1804.803-70 Checklist.

NASA Form 1098, Checklist for Contract Award File Content, shall be used as the "top page" in contract files.

1804.804 Closeout of contract files.

1804.804-2 Closeout of the contracting office files if another office administers the contract.

(b) Upon receiving the NASA Form 1611 or DD Form 1594, Contract Completion Statement, from the contract administration office and complying with FAR 4.804-2(b), the contracting officer shall complete the form.

1804.804-5 Procedures for closing out contract files.

(a) When the contracting office retains contract administration (excluding acquisitions under the simplified acquisition threshold), the contracting officer must comply with FAR 4.804-5(a) by completing NASA Form 1612, Contract Closeout Checklist, and DD Form 1593, Contract Administration Completion Record.

(b) To comply with FAR 4.804-5(b), the contracting officer must complete NASA Form 1611 or DD Form 1594, Contract Completion Statement, except for acquisitions under the simplified acquisition threshold.

1804.805 Storage, handling, and disposal of contract files.

(a) See NPG 1441.1C, Records Retention Schedules.

1804.805-70 Review, separation, and retirement of contract files.

(a) Upon determination of contract completion under the procedures outlined in 1804.804, each office shall remove the official contract files from the active file series, mark each file folder with "Completed (Date)", and place the folder in a completed (inactive) contract file series. Separate series should be established for contracts of $25,000 or less and for contracts of more than $25,000, to facilitate later disposal. Any original or official file copies of documents contained in duplicate or "working" contract files shall be removed and placed in the appropriate official file; any remaining material in the duplicate or "working" file shall be destroyed immediately or segregated and marked for early disposal.

(b) Each office shall review contractor "general" files (i.e., a file containing documents relating generally to a contractor rather than a specific contract) at least once annually and remove documents that --

(1) Are obsolete or superseded documents relating generally to the contractor (e.g., documents no longer pertinent to any aspect of a contractor's current or future capability, performance, or programs, and documents relating to a contractor that is no longer a possible source of supplies, services, or technical assistance) and dispose of the documents as authorized in 1804.805; or

(2) Pertain only to completed contracts. Place those files that are not routine in nature in inactive files for later disposal, and immediately dispose of routine documents as authorized in NPG 1441.1C, Records Retention Schedules.

Subpart 1804.9--Taxpayer Identification Number Information

1804.904 Reporting payment information to the IRS.

Each NASA installation, that has its own employer identification number, may elect to report to the IRS payments under purchase orders and contracts for merchandise and other exempt bills.

Subpart 1804.70--Transfer of Contracting Office Responsibility

1804.7000 Scope of subpart.

This subpart contains policies and procedures applicable to the transfer of contracts between NASA installations.

1804.7001 Definition.

"Transfer of a contract," as used in this subpart, means that process whereby a contract and all future responsibility for a contract held by one installation are transferred or reassigned in writing to another installation.

1804.7002 Approval of Transfer Requests.

(a) The approval authority for requests to transfer a contract is the official in charge of the cognizant Headquarters program office or designee. Requests for approval shall be submitted by the director of the transferring installation after receiving the concurrence of the director of the receiving installation. Concurrence of the Associate Deputy Administrator (Code AI) is also required for a transfer where an installation's roles and missions may be affected.

(b) Approval of a program transfer by the cognizant Headquarters official constitutes approval to transfer program-related contracts.

1804.7003 Responsibilities of the contracting officer of the transferring installation.

1804.7003-1 Coordinations.

The contracting officer of the transferring installation shall take the following steps before transferring the contract:

(a) Agree on a plan and schedule with the contracting officer of the receiving installation for transferring contract responsibility and contract files.

(b) Coordinate with the following offices:

(1) Financial Management Office, to determine the contract financial records to be transferred and the method, timing, and dollar amount of such transfers.

(2) Technical (Engineering and Project) Office, to determine the status of any outstanding engineering changes.


 4. The exclusion of this source will increase or maintain competition and is likely to result in reduction of     (2)     in overall costs for any anticipated acquisition of the supplies or services being acquired. This estimate is based on     (3)   .

(See Note 4 for the use of Alternates I and II below.)

Alternate I: The exclusion of this source will serve the national defense interest by having an alternative supplier available for furnishing the supplies or services being acquired, in case of a national emergency or industrial mobilization, because     (5)   .

Alternate II: The exclusion of this source will serve the national defense interest by establishing or maintaining an essential engineering, research, or development capability of an educational or other nonprofit institution or a federally funded research and development center, because     (5)     .

Determination

The exclusion of the source identified above will increase or maintain competition and is likely to result in reduced overall costs for any anticipated acquisition of the supplies or services being acquired.

(See Note 4 for the use of Alternates I and II below.)

Alternate I: It is in the interest of the national defense to exclude the source identified above in order to have an alternative supplier available for furnishing the supplies or services being acquired, in case of a national emergency or industrial mobilization.

Alternate II: It is in the interest of national defense to exclude the source identified above in order to establish or maintain an essential engineering, research, or development capability to be provided by an educational or other nonprofit institution or a federally funded research and development center.

Date___________

NOTES:

1. Name of source to be excluded.

2. Description of estimated reduction in overall costs.

3. Description of how estimate was derived.

4. In paragraph 4 and in the Determination, the basic wording is appropriate when FAR 6.202(a)(1) applies; Alternate I is appropriate when FAR 6.202(a)(2) applies; and Alternate II is appropriate when FAR 6.202(a)(3) applies.

5. Description of circumstances necessitating the exclusion of the identified source.

Subpart 1806.3--Other Than Full and Open Competition

1806.302 Circumstances permitting other than full and open competition.

1806.302-4 International agreement.

1806.302-470 Documentation.

Pursuant to 10 U.S.C. 2304(f)(2)(E), an individual justification for other than full and open competition under the authority of FAR 6.302-4 is not required when the procurement officer signs a Memorandum for the Record that:

(a) describes the specific terms of the international agreement or treaty that limit acquisitions in support of, or as a result of, the agreement or treaty to less than full and open competition; and

(b) is included in each official contract file in the place for filing a Justification for Other than Full and Open Competition (see NASA Form 1098).

1806.302-7 Public interest.

(c)(2) The notice to Congress shall be made by NASA Headquarters, Office of Legislative Affairs (Code L). Code HS shall request the notice to be made immediately upon approval of a D&F and shall advise the contracting activity of the date upon which the notification period ends.

(3) The contracting officer shall prepare the D&F required by FAR 6.302-7(c)(1) in any format that clearly documents the determination and the supporting findings.

1806.303 Justifications.

1806.303-1 Requirements.

(b) Justifications for using less than full and open competition may be prepared by the technical office initiating the contract action when it is recommending the use of the justification authority, or by the contracting officer if the technical office does not make such a recommendation.

(d) The contracting officer shall send a copy of each approved justification or D&F that cites the authority of FAR 6.302-3(a)(2)(i) or FAR 6.302-7 to NASA Headquarters, Office of Procurement (Code HK), unless one of the exceptions at FAR 25.401 applies to the acquisition. The transmittal shall indicate that the justification is being furnished under FAR 6.303-1(d).

1806.303-170 Sole-source purchases by contractors.

The requirements of FAR Part 6 and NFS Part 1806 apply if NASA directs a prime contractor (by specifications, drawings, parts lists, or otherwise) to purchase items on a sole-source basis. Accordingly, procurement officers shall take necessary actions to ensure that such sole-source acquisitions are properly justified. Where "brand name or equal" purchase descriptions list the salient physical, functional, or other characteristics of the item being procured and are properly used under 1811.104, the justification requirements of FAR Part 6 and NFS Part 1806 do not apply.

1806.303-2 Content.

1806.303-270 Use of unusual and compelling urgency authority.


Subpart 1815. 2--Solicitation and Receipt of Proposals and Information

1815.201 Exchanges with industry before receipt of proposals.

(c)(6)(A) Except for acquisitions described in 1815.300-70(b), contracting officers shall issue draft requests for proposals (DRFPs) for all competitive negotiated acquisitions expected to exceed $1,000,000 (including all options or later phases of the same project). DRFPs shall invite comments from potential offerors on all aspects of the draft solicitation, including the requirements, schedules, proposal instructions, and evaluation approaches. Potential offerors should be specifically requested to identify unnecessary or inefficient requirements. If the DRFP contains Government-unique standards, potential offerors should be invited to identify voluntary consensus standards that meet the Government's requirements as alternatives to Government-unique standards cited as requirements, in accordance with FAR 11.101 and OMB Circular A-119. When considered appropriate, the statement of work or the specifications may be issued in advance of other solicitation sections.

(B) Contracting officers shall plan the acquisition schedule to include adequate time for issuance of the DRFP, potential offeror review and comment, and NASA evaluation and disposition of the comments.

(C) When issuing DRFPs, potential offerors should be advised that the DRFP is not a solicitation and NASA is not requesting proposals.

(D) Whenever feasible, contracting officers should include a summary of the disposition of significant DRFP comments with the final RFP.

(E) If performance-based payments are planned to be used in a competitive negotiated acquisition, the DRFP shall request potential offerors to suggest terms, including performance events or payment criteria. Contracting officers shall use that information to establish a common set of performance-based payments parameters in the formal RFP when practicable.

(F) The procurement officer may waive the requirement for a DRFP upon written determination that the expected benefits will not be realized given the nature of the supply or service being acquired. The DRFP shall not be waived because of poor or inadequate planning.

(f)(i) Upon release of the formal RFP, the contracting officer shall direct all personnel associated with the acquisition to refrain from communicating with prospective offerors and to refer all inquiries to the contracting officer or other authorized representative. This procedure is commonly known as a "blackout notice" and shall not be imposed before release of the RFP. The notice may be issued in any format (e.g., letter or electronic) appropriate to the complexity of the acquisition.

(ii) Blackout notices are not intended to terminate all communication with offerors. Contracting officers should continue to provide information as long as it does not create an unfair competitive advantage or reveal proprietary data.

1815.203 Requests for proposals.

1815.203-70 Installation reviews.

(a) Installations shall establish procedures to review all RFPs before release. When appropriate given the complexity of the acquisition or the number of offices involved in solicitation review, centers should consider use of a single review meeting called a Solicitation Review Board (SRB) as a streamlined alternative to the serial or sequential coordination of the solicitation with reviewing offices. The SRB is a meeting in which all offices having review and approval responsibilities discuss the solicitation and their concerns. Actions assigned and changes required by the SRB shall be documented.

(b) When source evaluation board (SEB) procedures are used in accordance with 1815.370, the SEB shall review and approve the RFP prior to issuance.

1815.203-71 Headquarters reviews.

For RFPs requiring Headquarters review and approval, the procurement officer shall submit ten copies of the RFP to the Associate Administrator for Procurement (Code HS). Any significant information relating to the RFP or the planned evaluation methodology omitted from the RFP itself should also be provided.

1815.204 Contract format.

1815.204-2 Part I-The Schedule.

(c) To the maximum extent practicable, requirements should be defined as performance based specifications/statements of work that focus on required outcomes or results, not methods of performance or processes.

1815.204-5 Part IV-Representations and instructions.

(b) The information required in proposals should be kept to the minimum necessary for the source selection decision.

1815.204-70 Page limitations.

(a) Technical and contracting personnel will agree on page limitations for their respective portions of an RFP. Unless approved in writing by the procurement officer, the page limitation for the contracting portion of an RFP (all sections except Section C, Description/ specifications/work statement) shall not exceed 150 pages, and the page limitation for the technical portion (Section C) shall not exceed 200 pages. Attachments to the RFP count as part of the section to which they relate. In determining page counts, a page is defined as one side of a sheet, 8 1/2" x 11", with at least one inch margins on all sides, using not smaller than 12-point type. Foldouts count as an equivalent number of 8 1/2" x 11" pages. The metric standard format most closely approximating the described standard 8 1/2" x 11" size may also be used.

(b) Page limitations shall also be established for proposals submitted in competitive acquisitions. Accordingly, technical and contracting personnel will agree on page limitations for each portion of the proposal. Unless a different limitation is approved in writing by the procurement officer, the total initial proposal, excluding title pages, tables of content, and cost/price information, shall not exceed 500 pages using the page definition of 1815.204-70(a). Firm page limitations shall also be established for final proposal revisions, if requested. The appropriate page limitations for final proposal revisions should be determined by considering the complexity of the acquisition and the extent of any discussions. The same page limitations shall apply to all offerors. Pages submitted in excess of specified limitations will not be evaluated by the Government and will be returned to the offeror.

1815.207 Handling proposals and information.

1815.207-70 Release of proposal information.

(a) NASA personnel participating in any way in the evaluation may not reveal any information concerning the evaluation to anyone not also participating, and then only to the extent that the information is required in connection with the evaluation. When non-NASA personnel participate, they shall be instructed to observe these restrictions.


PART 1823
ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY,
AND DRUG-FREE WORKPLACE

TABLE OF CONTENTS

SUBPART 1823.3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA

1823.370 Acquisition of potentially hazardous items from or through another Government agency.

SUBPART 1823.5 DRUG-FREE WORKPLACE

1823.570 Drug- and alcohol-free workforce.

1823.570-1 Scope.

1823.570-2 Definitions.

1823.570-3 Contract clause.

1823.570-4 Suspension of payments, termination of contract, and debarment and suspension actions.

SUBPART 1823.70 SAFETY AND HEALTH

1823.7001 NASA contract clauses.

SUBPART 1823.71 FREQUENCY AUTHORIZATION

1823.7101 Contract clause.

1823.7102 Procedures.

PART 1823
ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY,
AND DRUG-FREE WORKPLACE

Subpart 1823.3--Hazardous Material Identification and
Material Safety Data

1823.370 Acquisition of potentially hazardous items from or through another Government agency.

When acquiring supplies or services from or through another Government agency (e.g., see FAR Part 8 and FAR Subpart 17.5), NASA shall request that agency to furnish NASA the data required by FAR Subpart 23.3.

Subpart 1823.5--Drug-Free Workplace

1823.570 Drug- and alcohol-free workforce.

1823.570-1 Scope.

Sections 1823.570 to 1823.570-4 set forth NASA requirements for mandatory drug and alcohol testing of certain contractor personnel under section 203, National Aeronautics and Space Act of 1958, as amended, 42 U.S.C. 2473, 72 Stat. 429; and Civil Space Employee Testing Act of 1991, Public Law 102-195, sec. 21, 105 Stat. 1616 to 1619.

1823.570-2 Definitions.

As used in this subpart employee and controlled substance are as defined in FAR 23.503. The use of a controlled substance in accordance with the terms of a valid prescription, or other uses authorized by law shall not be subject to the requirements of 1823.570 to 1823.570-4 and the clause at 1852.223-74.

"Employee in a sensitive position" means a contractor or subcontractor employee who has been granted access to classified information; a contractor or subcontractor employee in other positions that the contractor or subcontractor determines could reasonably be expected to affect safety, security, National security, or functions other than the foregoing requiring a high degree of trust and confidence; and includes any employee performing in a position designated "mission critical" pursuant to the clause at 1852.246-70. The term also includes any applicant who is interviewed for a position described in this paragraph.

"Use, in violation of applicable law or Federal regulation, of alcohol" includes having, while on duty or during a preemployment interview, an alcohol concentration of 0.04 percent by weight or more in the blood, as measured by chemical test of the individual's breath or blood. An individual's refusal to submit to such test is presumptive evidence of use, in violation of applicable law or Federal regulation, of alcohol.

1823.570-3 Contract clause.

The contracting officer shall insert the clause at 1852.223-74, "Drug- and Alcohol-Free Workforce," in all solicitations and contracts containing the clause at 1852.246-70, "Mission Critical Space Systems Personnel Reliability Program," and in other solicitations and contracts exceeding $5 million in which work is performed by an employee in a sensitive position. However, the contracting officer shall not insert the clause at 1852.223-74 in solicitations and contracts for commercial items (see FAR parts 2 and 12).

1823.570-4 Suspension of payments, termination of contract, and debarment and suspension actions.

The contracting officer shall comply with the procedures of FAR 23.506 regarding the suspension of contract payments, the termination of the contract for default, and debarment and suspension of a contractor relative to failure to comply with the clause at 1852.223-74. Causes for suspension of contract payments, termination of the contract for default, and debarment and suspension of the contractor are the following:

(a) The contractor fails to comply with paragraph (b), (c), or (d) of the clause at 1852.223-74; or

(b) Such a number of contractor employees in sensitive positions having been convicted of violations of criminal drug statutes or substantial evidence of drug or alcohol abuse or misuse occurring in the workplace, as to indicate that the contractor has failed to make a good faith effort to provide a drug- and alcohol-free workforce.

Subpart 1823.70--Safety and Health

1823.7001 NASA contract clauses.

(a) Except as provided in paragraph (b) of this section, the clause at 1852.223-70 shall be included in--

(1) All negotiated contracts of $1,000,000 or more;

(2) All construction, repair, or alteration contracts in excess of the simplified acquisition threshold;

(3) All contracts having, within their total requirement, construction, repair, or alteration tasks in excess of the simplified acquisition threshold; and

(4) Any acquisition regardless of dollar amount when (i) any deliverable contract end item is of a hazardous nature, or (ii) during the life of the contract it can reasonably be expected that hazards will be generated within the operational environment and the contracting officer determines that they warrant inclusion of the clause.

(b) The clause prescribed in paragraph (a) of this section may be excluded--

(1) from any contract subject to the Walsh-Healey Public Contracts Act (see FAR Subpart 22.6) or the Service Contract Act of 1965 (see FAR Subpart 22.10) in which the application of the act and its implementing regulations constitute adequate safety and health protection;

(2) when the contracting officer makes a written determination that the clause is not necessary under the circumstances of the acquisition, and;

(3) exclusion of the clause is approved by the installation safety and health official.

(c) The contracting officer shall insert the provision at 1852.223-73, Safety and Health Plan, in solicitations containing the clause at 1852.223-70, when a Safety and Health Plan is to be submitted with the offeror's proposal. This clause may be modified to identify specific information that is to be included in the plan. The contracting officer shall include the approved plan in any resulting contract.

(d) When the installation safety and health official recommends that a Safety and Health Plan be submitted by the apparently successful offeror after notification of selection but before contract award, the provision at 1852.223-73 shall be used with its Alternate I.

Subpart 1823.71--Frequency Authorization

1823.7101 Contract clause.

The contracting officer shall insert the clause at 1852.223-71, Frequency Authorization, in solicitations and contracts calling for developing, producing, constructing, testing, or operating a device for which a radio frequency authorization is required.

1823.7102 Procedures.

The contracting officer shall obtain the necessary frequency authorization and other procedural details from the installation's spectrum manager.


PART 1832
CONTRACT FINANCING

TABLE OF CONTENTS

1832.006-2 Definitions.

SUBPART 1832.1 NON-COMMERCIAL ITEM PURCHASE FINANCING

1832.111 Contractor clauses for non-commercial purchases.

1832.111-70 NASA contract clause.

SUBPART 1832.2 COMMERCIAL ITEM PURCHASE FINANCING

1832.202-1 Policy.

1832.206 Solicitation provisions and contract clauses.

SUBPART 1832.4 ADVANCE PAYMENTS FOR NON-COMMERCIAL ITEMS

1832.402 General.

1832.406 Letters of credit.

1832.407 Interest.

1832.409 Contracting officer action.

1832.409-1 Recommendation for approval.

1832.409-170 NASA procedure for approval.

1832.410 Findings, determination, and authorization.

1832.412 Contract clause.

1832.412-70 NASA contract clauses.

SUBPART 1832.5 PROGRESS PAYMENTS BASED ON COSTS

1832.501 General.

1832.501-1 Customary progress payment rates.

1832.501-2 Unusual progress payments.

1832.502 Preaward matters.

1832.502-2 Contract finance office clearance.

1832.502-4 Contract clauses.

1832.502-470 NASA contract clause.

1832.503 Postaward matters.

1832.503-5 Administration of progress payments.

1832.504 Subcontracts.

SUBPART 1832.7 CONTRACT FUNDING

1832.702 Policy.

1832.702-70 NASA policy.

1832.704 Limitation of cost or funds.

1832.704-70 Incrementally funded fixed-price contracts.

1832.705 Contract clauses.

1832.705-2 Clauses for limitation of cost or funds.

1832.705-270 NASA clauses for limitation of cost or funds.

SUBPART 1832.9 PROMPT PAYMENT

1832.906 Contract financing payments.

1832.908 Contract clauses.

SUBPART 1832.10 PERFORMANCE-BASED PAYMENTS

1832.1001 Policy.

1832.1004 Procedure.

1832.1005 Contract clauses.

1832.1009 Title.

SUBPART 1832.11 ELECTRONIC FUNDS TRANSFER

1832.1110 Solicitation provision and contract clauses.

 

PART 1832

CONTRACT FINANCING

1832.006-2 Definitions.

The Associate Administrator for Procurement is the Agency remedy coordination official.

Subpart 1832.1--Non-Commercial Item Purchase Financing

1832.111 Contract clauses for non-commercial purchases.

1832.111-70 NASA contract clause.

The contracting officer shall insert the clause at 1852.232-79, Payment for On-Site Preparatory Costs, in solicitations and contracts for construction on a fixed-price basis when progress payments are contemplated and pro rata payment of on-site preparatory costs to the contractor is appropriate.

Subpart 1832.2--Commercial Item Purchase Financing

1832.202-1 Policy.

(b)(6) Advance payment limitations do not apply to expendable launch vehicle (ELV) service contracts. (see 1832.402).

1832.206 Solicitation provisions and contract clauses.

(g)(2) The installment payment rate shall be that which is common in the commercial marketplace for the purchased item. If there is no commonly used rate, the contracting officer shall determine the appropriate rate. In no case shall the rate exceed that established in the clause at FAR 52.232-30.

Subpart 1832.4--Advance Payments for Non-Commercial Items

1832.402 General.

(e)(1) The Director of the Headquarters Office of Procurement Contract Management Division (Code HK) is the approval authority for all advance payments except the following:

(A) The procurement officer is the approval authority for non-fee bearing contracts with domestic entities when the cumulative contract value is $25,000,000 or less, and for all increases to such contracts over $25,000,000 previously approved by the Headquarters Office of Procurement as long as the advance payment amount outstanding at any time is not increased.

(B) The contracting officer is the approval authority for the following actions. In these cases, a findings and determination (see FAR 32.410) is not required.

(a) Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Phase I contracts. A class deviation has been signed, effective through September 30, 2000 (for SBIRs) and September 30, 2001 (for STTRs), authorizing use of advance payments on these contracts. The contracting officer shall annotate the contract file that the deviation is on file at the NASA Headquarters Office of Procurement (Code HK).

(b) Expendable launch vehicle (ELV) service contracts. 42 U.S.C. 2459c authorizes advance payments for these contracts. The contracting officer shall document the contract file with the rationale for approving the use of advance payments.

(e)(2) All advance payment authorization requests, except those authorized by 1832.402(e)(1)(B), shall be coordinated with the installation Deputy Chief Financial Officer.

1832.406 Letters of credit.

(b)(1) Each installation is considered a contracting agency for the purposes of this requirement.

1832.407 Interest.

(d)(1) Advance payments without interest are authorized.

1832.409 Contracting officer action.

1832.409-1 Recommendation for approval.

1832.409-170 NASA procedure for approval.

In addition to the items listed in FAR 32.409-1, requests for Headquarters approval of advance payments (see 1832.402(e)(1)) shall include the following information:

(a) Name of the cognizant NASA Headquarters program or staff office;

(b) Name and phone number of the contracting officer or negotiator;

(c) A copy of the proposed advance payments clause;

(d) If a profit/fee is contemplated, the factors considered in determining the profit/fee (see 1815.404-470);

(e) Information justifying the adequacy of security to cover the maximum advance payment amount at any time outstanding.

1832.410 Findings, determination, and authorization.

(b) Generally, the format in FAR 32.410 should be used, tailored as follows:

(i) In format subparagraph (a)(2), use the phrase "Advance payments (in an amount not to exceed $..... at any time outstanding)" in all determinations and findings. The phrase means the maximum unliquidated dollar amount a contractor would need in advance payments at any point in time for the particular contract. The amount would not usually be the full contract value. The amount inserted should be based on an analysis of the contractor's financing needs (monthly or other appropriate period) for the specific contract involved.

(ii) In the second sentence of format subparagraph (a)(4), delete the reference to a special bank account if no special bank account is required.

(iii) Use format subparagraph (a)(6), not (a)(7) or (a)(8).

(iv) At the end of format paragraph (b), use "is in the public interest."

(v) in format paragraph (c), use the phrase "(the amount at any time outstanding)" in all determinations and findings.

1832.412 Contract clause.

(e) The contracting officer shall use Alternates IV and V when advance payments are

provided on Phase I contracts of the Small Business Innovation Research (SBIR) or Small Business Technology Transfer (STTR) programs.

(f) See 1832.412(e).

1832.412-70 NASA contract clauses.

When the clause at FAR 52.232-12 or its Alternates II or V are used, insert the clause at 1852.232-70, NASA Modification of FAR 52.232-12.

Subpart 1832.5--Progress Payments Based on Costs

1832.501 General.

1832.501-1 Customary progress payment rates.

(a) The customary progress payment rate for all NASA contracts is 85 percent for large business, 90 percent for small business, 95 percent for small disadvantaged business, and 100 percent for Phase II contracts in the Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs. The contracting officer shall insert the applicable percentage in paragraphs (a) and (b) of the clause at FAR 52.232-16.

1832.501-2 Unusual progress payments.

The Director of the Headquarters Office of Procurement Contract Management Division (Code HK) is the approval authority for the use of unusual progress payments.

1832.502 Preaward matters.

1832.502-2 Contract finance office clearance.

The Director of the Headquarters Office of Procurement Contract Management Division (Code HK) is the approval authority for the actions at FAR 32.502-2, except the Associate Administrator for Procurement (Code HK) is the approval authority for any deviations addressed in FAR 32.502-2(b).

1832.502-4 Contract clauses.

1832.502-470 NASA contract clause.

The contracting officer may insert a clause substantially as stated at 1852.232-82, Submission of Requests for Progress Payments, in fixed-price solicitations and contracts that provide for progress payments. The recipient of the requests and number of copies may be changed as required.

1832.503 Postaward matters.

1832.503-5 Administration of progress payments.

(c)(i) If the contractor requests it and the contracting officer approving individual progress payments agrees, the administration of progress payments may be based on the overall contract agreement. Under this method, the contractor must include a supporting schedule with each request for a progress payment. The schedule should identify the costs applicable to each order.

(ii) The contracting officer may treat a group of orders as a single unit for administration of progress payments if each order in the group is subject to a uniform liquidation rate and under the jurisdiction of the same payment office.

1832.504 Subcontracts.

(c) Unusual progress payments to subcontractors shall be approved in accordance with 1832.501-2.

Subpart 1832.7--Contract Funding

1832.702 Policy.

1832.702-70 NASA policy.

(a) Cost-reimbursement contracts may be incrementally funded only if all the following conditions are met (except that, for cost-reimbursement R&D contracts under which no supplies are deliverable, only the condition in subparagraph (a)(3) of this subsection applies):

(1) The total value of the contract (including options as defined in FAR Subpart 17.2) is $1,000,000 or more.

(2) The period of performance under the contract overlaps the succeeding fiscal year.

(3) The funds are not available to fund the total contract value fully at award.

(b) Fixed-price contracts, other than those for research and development, shall not be incrementally funded.

(c)(1) Fixed-price contracts for research and development may be incrementally funded if the conditions in 1832.702-70(a)(1)-(3) are met and the initial funding of the contract is not less than 50 percent of the total fixed price.

(2) Incrementally funded fixed-price contracts shall be fully funded as soon as adequate funding becomes available.

(d) The procurement officer, with the concurrence of the installation Comptroller, may waive any of the conditions set forth in paragraphs 1832.702-70(a)-(c). The procurement officer shall maintain a record of all such approvals during the fiscal year.

(e) A class deviation from the conditions set forth in paragraphs 1832.702-70(a), (b) and (c) exists to permit incremental funding of contracts under Phase II of the Small Business Innovation Research (SBIR) Program (through September 30, 2000) and Phase II of the Small Business Technology Transfer (STTR) program (through September 30, 2001). This deviation exists with the understanding that the contracts will be fully funded when funds become available.

1832.704 Limitation of cost or funds.

1832.704-70 Incrementally funded fixed-price contracts.

(a) Upon receipt of the contractor's notice under paragraph (c)(1) of the clause at 1852.232-77, Limitation of Funds (Fixed-Price Contract), the contracting officer shall promptly provide written notice to the contractor that the Government is --

(1) Allotting additional funds in a specified amount for continued performance;

(2) Terminating the contract; or

(3) Considering whether to allot additional funds; and

(i) The contractor is entitled to stop work in accordance with paragraph (b) of the clause at 1852.232-77, Limitation of Funds; and

(ii) Any costs expended beyond the amount specified in paragraph (a) of the clause at 1852.232-77, Limitation of Funds, are incurred at the contractor's risk.

(b) Upon determining that the contract will receive no further funds, the contracting officer shall promptly give notice of the Government's decision and terminate for the convenience of the Government.

1832.705 Contract clauses.

1832.705-2 Clauses for limitation of cost or funds.

1832.705-270 NASA clauses for limitation of cost or funds.

(a) The contracting officer shall insert the clause at 1852.232-77, Limitation of Funds (Fixed-Price Contract), in solicitations and contracts for fixed-price incrementally funded research and development.

(b) The contracting officer shall insert a clause substantially as stated at 1852.232-81, Contract Funding, in Section B of solicitations and contracts containing the clause at FAR 52.232-22, Limitation of Funds. Insert the amounts of funds available for payment, the items covered, and the applicable period of performance. The amount obligated for fee in paragraph (b) of the clause should always be sufficient to pay fee anticipated to be earned for the work funded by the amount in paragraph (a) of the clause.

Subpart 1832.9--Prompt Payment

1832.906 Contract financing payments.

(a) Except as authorized in 1832.908, it is NASA's policy to make contract financing payments on the 30th day after the designated billing office has received a proper request. However, the due date for making contract financing payments for a specific contract may be earlier than the 30th day, but not earlier than 7 days, after the designated billing office has received a proper request, provided that:

(i) The contractor provides consideration whose value is determined to be greater than the cost to the United States Treasury of interest on funds paid prior to the 30th day, calculated using the Current Value of Funds Rate published annually in the Federal Register (subject to quarterly revision);

(ii) The contracting officer approves the payment date change, with the concurrence of the installation Financial Management Officer; and

(iii) The contract file includes documentation regarding the value of the consideration and the analysis determining that value.

1832.908 Contract clauses.

(c)(3) When the clause at FAR 52.232-25, Prompt Payment, is used in such contracts with the Canadian Commercial Corporation (CCC), insert "17th" in lieu of "30th" in paragraphs (a)(1)(i)(A), (a)(1)(i)(B), and (a)(1)(ii).

Subpart 1832.10--Performance-Based Payments

1832.1001 Policy.

(a)(i) In determining whether performance-based payments are practical in competitive negotiated acquisitions, the contracting officer should consider the procedural impacts (e.g., proposal evaluation complications, longer evaluations, elimination of the potential for award without discussions, increased proposal information requirements) and the impact on small business competitiveness.

(ii) The contracting officer must obtain approval from the Director of the Headquarters Office of Procurement Contract Management Division (Code HK) to use performance-based payments in competitive negotiated solicitations under $50M. The request for approval must include an assessment of the practicality of using performance-based payments, as well as the proposed performance-based payments evaluation approach (see 1832.1004(e)(1)(ii)).

1832.1004 Procedures.

(a) See 1815.201(c)(6)(E) for establishing performance bases and payment terms in competitive negotiated acquisitions.

(e)(1)(ii) Use of the price adjustment evaluation technique may require obtaining and analyzing proposal information that is normally not required in NASA firm-fixed-price competitions (see 1815.403-3). When using performance-based payments in competitive negotiated acquisitions under $50 million, contracting officers should consider the use of alternative evaluation methods, e.g., qualitative evaluation under Mission Suitability or another appropriate factor.

1832.1005 Contract clauses.

(a) If the contract is for launch services, the contracting officer shall delete paragraph (f) of the clause at FAR 52.232-32 in accordance with 1832.1009.

(b)(2) Contracting officers shall not use Alternate I in competitive negotiated acquisitions under $50 million, unless approval has been obtained to use performance-based payments (see 1832.1001(a)(ii)).

1832.1009 Title.

In accordance with 42 U.S.C. 2465d, NASA shall not take title to launch vehicles under contracts for launch services unless one of the exceptions in the law applies. However, the law does not eliminate NASA's right to take title to other property acquired or produced by the contractor under a contract containing a title provision.

Subpart 1832.11--Electronic Funds Transfer

1832.1110 Solicitation provision and contract clauses.

(a)(1) NASA does not use the Central Contractor Registration. Use the clause at FAR 52.232-34, Payment by Electronic Funds Transfer--Other than Central Contractor Registration.

(b) In accordance with FAR 32.1106(b), the use of a nondomestic EFT mechanism is authorized. When a nondomestic EFT mechanism is used, the contracting officer shall replace the paragraph at FAR 52.232-34(c) with a description of the EFT mechanism that will be used for the contract.

(c) The payment office shall be the designated office for receipt of contractor EFT information for all NASA contracts.


 1845.302-71 Determination and findings.

(a) Procedure. Determination and findings (D&F) required under FAR 45.302-1(a)(4) and 1845.302-1(a)(4) shall be prepared by the contracting officer and approved by the procurement officer. Prior to approval, concurrence must be obtained from the SEMO to ensure agreement on the use of the Government facilities by the contractor. D&Fs shall address individual types of facilities to be provided to the contractor. Reference to specific variations in quantities of items to be provided should be included in the D&F if additional requirements are anticipated. A separate D&F is required before adding new types of items or significant changes in quantity or before adding any new work to the contract that requires additional Government facilities.

(b) Format. A sample format follows:

(Format)
National Aeronautics and Space
Administration
Washington, DC 20546

Determination and Findings

Decision to Provide Government Facilities

On the basis of the following findings and determinations, Government-owned facilities may be provided to    [insert the name of the contractor]    pursuant to the authority of FAR 45.302-1(a)(4).

Findings

1. The    [insert the name of the contracting activity]    and the contractor (have entered)/(proposed to enter) into Contract No.    [insert the contract number]   . (Include the following information: Type of contract, contract value, and a brief description of the scope of work performed under the contract.)

2. (Justify that Government facilities are needed for performance under the contract. The justification shall demonstrate either (i) that the contract cannot be fulfilled by any other means, or (ii) that it is in the public interest to provide the facilities. It is imperative that the justification be fully substantiated by evidence.)

3. (If the contract effort cannot be fulfilled by any other means, indicate why the contractor cannot provide the facilities. For example, due to financial constraints, the contractor has demonstrated inability to acquire the facilities; or, even though the contractor is willing and financially able to acquire these facilities for its own account, the contractor has stated that time will not permit making arrangements to obtain timely delivery to meet NASA requirements. If timely delivery is the problem, state when the contractor will replace the Government facilities with contractor-owned facilities. Address leadtime, validate the contractor's claims, and state that private financing was sought and either not available or not advantageous to the Government. If private financing was not advantageous to the Government, provide justification. Indicate other alternatives considered and reasons for rejection.)

4. (Describe the types of facilities to be provided and any variation in quantities of items based on functional requirements. Explain how these facilities pertain to the scope of work to be completed. State that the contract cannot be accomplished without the specified facility items being provided. Include an estimate of the value of the facilities and a statement that no facilities items under $10,000 unit cost will be provided unless the contractor is a nonprofit, on-site, or the facilities are only available from the Government.

5. (Indicate whether the property will be accountable under this contract or a separate facilities contract.)

Determination

For the reasons set forth above, it is hereby determined that the Government-owned facilities identified herein will be provided to the contractor.

                                   

Procurement Officer Date

(End of format)

Subpart 1845.4--Contractor Use and Rental of Government Property

1845.402 Authorizing use of Government production and research property.

(a)(i) A NASA contracting officer desiring to authorize use of Government property under the cognizance of another contracting officer shall obtain that contracting officer's concurrence.

(ii) NASA contracting officers having cognizance over NASA property may authorize its use on contracts of other agencies if such use will not interfere with NASA's primary purpose for the property and will not extend beyond the expected expiration or completion date of the NASA contract.

1845.403 Rental--Use and Charges clause.

(a) The Center Director is designated as the authority to make the determinations on modified rental rates.

1845.405 Contracts with foreign governments or international organizations.

1845.405-70 NASA procedures.

(a) NASA policy is to recover a fair share of the cost of Government production and research property if such property is used in performing services or manufacturing articles for foreign countries or for international organizations.

(b)The prior written approval of the Associate Administrator for Procurement (Code H) is required for the use of Government production and research property on work for foreign countries or for international organizations. The Logistics Management Office of the Headquarters Office of Management Systems (Code JG), the Office of General Counsel (Code G), and the Headquarters Office of External Relations (Code I) are required concurrences.

(c) Contracting officers shall forward requests for approval to Code HS, along with a summary of the circumstances involved, including as a minimum --

(1) The name of the requesting contractor;

(2) The number of the contract under which the equipment is controlled;

(3) A description of the equipment;

(4) The name of the foreign contractor and the relationship of the foreign contractor to its government or to any international organization;

(5) A description of the articles to be manufactured or services to be performed;

(6) A statement that the intended use will not interfere with the current or foreseeable requirements of the United States or require use of the equipment beyond the expected expiration or completion date of the NASA contract;

(7) A statement that the use of Government property is consistent with the best interests of the United States;

(8) A statement that such use is legally authorized; and

(9) Any evidence of endorsement by another agency of the U.S. Government based on national security or foreign policy of the United States (e.g., an approved license or agreement from the Department of State or Department of Commerce).

(d) Use, if approved, shall be subject to rent in accordance with FAR 45.403.

1845.406 Use of Government production and research property on independent research and development programs.

1845.406-70 NASA policy.

The contracting officer should not authorize contractor use of Government property for independent research and development on a rent-free basis except in unusual circumstances when it has been determined by the contracting officer that--

(a) Such use is clearly in the best interests of the Government (for example, the project can reasonably be expected to be of value in specific Government programs); and

(b) No competitive advantage will accrue to the contractor through such use (see FAR 45.201).

1845.407 Non-Government use of plant equipment.

For NASA, the coverage in FAR 45.407, applies to all equipment, not just plant equipment.

(a)(i) The Associate Administrator for Procurement (Code HS) is the approval authority for non-Government use of equipment exceeding 25 percent.

(ii) The percentage of Government and non-Government use shall be computed on the basis of time available for use. For this purpose, the contractor's normal work schedule, as represented by scheduled production shift hours, shall be used. All equipment having a unit acquisition cost of less than $25,000 at any single location may be averaged over a quarterly period. Equipment having a unit acquisition cost of $25,000 or more shall be considered on an item-by-item basis.

(iii) Approval for non-Government use of less than 25 percent shall be for a period not exceeding 1 year. Approval for non-Government use in excess of 25 percent shall not be for less than 3 months.

(iv) Requests for the approval shall be submitted to Code HS at least 6 weeks in advance of the projected use and shall include--

(A) The number of equipment items involved and their total acquisition cost; and

(B) An itemized listing of equipment having an acquisition cost of $25,000 or more, showing for each item the nomenclature, year of manufacture, and acquisition cost.

Subpart 1845.5--Management of Government Property in the Possession of Contractors

1845.502 Contractor responsibility.

1845.502-1 Receipts for Government property.

Receipts for Government property shall comply with the instructions for preparing NASA Form 1018, NASA Property in the Custody of Contractors (see 1845.7101).

1845.502-70 Contractor-acquired property.

All contractor-acquired property must be authorized by the contract and is subject to a determination by the contracting officer that it is allocable to the contract and reasonably necessary. The acquisition (and fabrication) of Government property is further subject to the following conditions, depending on category of property:

(a) Facilities.

(1) Prior contracting officer approval, if the facilities are not already specifically described in the contract as contractor-acquired.

(2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format, and return of Certificate of Nonavailability.

(3) Submission of the written statement prescribed by FAR 45.302-1(a)(4).

(b) Special test equipment.

(1) Contracting officer approval 30 days in advance if the equipment is not identified in the solicitation or contract.

(2) Submission of DD Form 1419, or equivalent format, and return of Certificate of Nonavailability.

(c) Special tooling.

(1) If the contract contains a Subcontracts clause, advance notification to the contracting officer and contracting officer consent if required by that clause.

(2) If the contract is a fixed-price contract, submission of the list to the contracting officer within 60 days after delivery of the first production end items (or later as prescribed by the contracting officer), unless the tooling is already identified in the solicitation.

(3) Submission of DD Form 1419 or equivalent format and return of Certificate of Nonavailability.

(d) Material. If the contract contains a Subcontracts clause, advance notification to the contracting officer and contracting officer consent if required by that clause.

(e) Agency-peculiar property.

(1) If the contract contains a Subcontracts clause, advance notification to the contracting officer and contracting officer consent if required by that clause.

(2) Submission of DD Form 1419, or equivalent format, and return of Certificate of Nonavailability.

1845.505 Records and reports of Government property.