AWARD FEE EVALUATIONS

PURPOSE: To correct inaccurate references and improve clarity on award fee evaluations.

BACKGROUND: NASA has different award fee evaluation procedures for service and end item contracts. For service contracts, all award fee evaluations during the contract term are final. For end item contracts, evaluations during the contract term are "interim" evaluations that are superseded by a single final evaluation at contract completion. The NFS has inaccurate references associating interim evaluations with service contracts, and these are deleted by this rule. In addition, NASA allow for provisional payment of award fee, i.e., payments made during award fee periods in anticipation of the Government evaluation at the end of the period. References to provisional payments in the NFS are inconsistent, and this rule conforms these references. Finally, to improve its clarity, the NFS coverage is restructured and miscellaneous editorial changes are made. None of the NFS revisions in this rule change NASA policy.

REGULATION: Parts 1816 and 1852 are amended as set forth in the enclosed replacement pages to the NFS.

REPLACEMENT PAGES: You may use the enclosed pages to replace Part 1816, 52-13, 52-14, 52-15, 52-16, 52-17, 52-18, 52-19, 52-20, 52-21, 52-91, and 52-92 to the NFS.

REGULATORY COMPLIANCE: This PN was published as a final rule in the Federal Register (63 FR 13133-13134, dated March 18, 1998).

EFFECTIVE DATE: This PN is effective as dated and shall remain in effect until canceled or superseded.

HEADQUARTERS CONTACT: Tom O'Toole, Code HK, (202) 358-0478, e-mail: thomas.otoole@hq.nasa.gov.

R. Scott Thompson

Director, Contract Management Division

Enclosures


PART 1816

TYPES OF CONTRACTS

TABLE OF CONTENTS

SUBPART 1816.1 SELECTING CONTRACT TYPES

1816.104 Factors in selecting contract types.

1816.104-70 Contract type of performance-based contracting (PBC).

SUBPART 1816.2 FIXED-PRICE CONTRACTS

1816.202 Firm-fixed-price contracts.

1816.202-70 NASA contract clause.

1816.203 Fixed-price contracts with economic price adjustment.

1816.203-4 Contract clauses.

SUBPART 1816.3 COST-REIMBURSEMENT CONTRACTS

1816.303-70 Cost-sharing contracts.

1816.306 Cost-plus-fixed-fee contracts.

1816.307 Contract clauses.

1816.307-70 NASA contract clauses.

SUBPART 1816.4 INCENTIVE CONTRACTS

1816.402 Application of pre-determined, formula-type incentives.

1816.402-2 Pperformance incentives.

1816.402-270 NASA technical performance incentives.

1816.404 Fixed-price contracts with award fees.

1816.405 Cost-reimbursement incentive contracts.

1816.405-2 Cost-plus-award-fee (CPAF) contracts.

1816.405-270 CPAF contracts.

1816.405-271 Base fee.

1816.405-272 Award fee evaluation periods.

1816.405-273 Award fee evaluations.

1816.405-274 Award fee evaluation factors.

1816.405-275 Award fee evaluation scoring.

1816.405-276 Award fee payments and limitations.

1816.406 Contract clauses.

1816.406-70 NASA contract clauses.

SUBPART 1816.5 INDEFINITE-DELIVERY CONTRACTS

1816.504 Indefinite quantity contracts.

1816.505 Ordering.

1816.505-70 Task Ordering.

1816.506-70 NASA contract clause.

SUBPART 1816.6 TIME-AND-MATERIALS, LABOR-HOUR, AND LETTER CONTRACTS

1816.603 Letter contracts.

1816.603-370 Approvals.

PART 1816

TYPES OF CONTRACTS

Subpart 1816.1 -- Selecting Contract Types

1816.104 Factors in selecting contract types.

1816.104-70 Contract type for performance-based contracting (PBC).

(a) PBC is defined in FAR 37.101 and discussed in FAR 37.6. Although FAR Part 37 primarily addresses services contracts, PBC is not limited to these contracts. PBC is the preferred way of contracting for all supplies and services at NASA. Generally, when contract performance risk under a PBC specification can be fairly shifted to the contractor to allow for the operation of objective incentives, a contract type with objectively measurable incentives (e.g., FFP, FPIF, or CPIF) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using quantitative measures, a CPAF contract may be used.

(b) A level-of-effort contract is not PBC.

Subpart 1816.2--Fixed-Price Contracts

1816.202 Firm-fixed-price contracts.

1816.202-70 NASA contract clause.

The contracting officer shall insert the clause at 1852.216-78, Firm-Fixed-Price, in firm-fixed-price solicitations and contracts. Insert the appropriate amount in the resulting contract.

1816.203 Fixed-price contracts with economic price adjustment.

1816.203-4 Contract clauses.

(a) In addition to the approval requirements in the prescriptions at FAR 52.216-2 through 52.216-4, the contracting officer shall coordinate with the installation's Deputy Chief Financial Officer (Finance) before exceeding the ten-percent limit in paragraph (c)(1) of the clauses at FAR 52.216-2 through 52.216-4.

(d)(2) Contracting officers shall contact the Office of Procurement, Code HC, for specific guidance on preparing clauses using cost indexes. Such clauses require advance approval by the Associate Administrator for Procurement. Requests for approval shall be submitted to the Headquarters Office of Procurement (Code HS).

Subpart 1816.3--Cost-Reimbursement Contracts

1816.303-70 Cost-sharing contracts.

(a) Cost-sharing with for-profit organizations.

(1) Cost sharing by for-profit organizations is mandatory in any contract for basic or applied research resulting from an unsolicited proposal, and may be accepted in any other contract when offered by the proposing organization. The requirement for cost-sharing may be waived when the contracting officer determines in writing that the contractor has no commercial, production, education, or service activities that would benefit from the results of the research, and the contractor has no means of recovering its shared costs on such projects.

(2) The contractor's cost-sharing may be any percentage of the project cost. In determining the amount of cost-sharing, the contracting officer shall consider the relative benefits to the contractor and the Government. Factors that should be considered include--

(i) the potential for the contractor to recover its contribution from non-Federal sources;

(ii) the extent to which the particular area of research requires special stimulus in the national interest; and

(iii) the extent to which the research effort or result is likely to enhance the contractor's capability, expertise, or competitive advantage.

(b) Cost-sharing with not-for-profit organizations.

(1) Costs to perform research stemming from an unsolicited proposal by universities and other educational or not-for-profit institutions are usually fully reimbursed. When the contracting officer determines that there is a potential for significant benefit to the institution cost-sharing will be considered.

(2) The contracting officer will normally limit the institution's share to no more than 10 percent of the project's cost.

(c) Implementation.

Cost-sharing shall be stated as a minimum percentage of the total allowable costs of the project. The contractor's contributed costs may not be charged to the Government under any other contract or grant, including allocation to other contracts and grants as part of an independent research and development program.

1816.306 Cost-plus-fixed-fee contracts.

(d) Completion and term forms.

(4) Term form contracts are incompatible with performance base contracting (PBC) and should not be used with PBC requirements.

1816.307 Contract clauses.

(a) In paragraph (h)(2)(ii)(B) of the Allowable Cost and Payment clause at FAR 52.216-7, the period of years may be increased to correspond with any statutory period of limitation applicable to claims of third parties against the contractor; provided, that a corresponding increase is made in the period for retention of records required in paragraph (f) of the clause at FAR 52.215-2, Audit and Records - Negotiation.

(b) In solicitations and contracts containing the clause at FAR 52.216-8, Fixed Fee, the Schedule shall include appropriate terms, if any, for provisional billing against fee.

(d) In solicitations and contracts containing the clause at FAR 52.216-10, Incentive Fee, the Schedule shall include appropriate terms, if any, for provisional billing against fee.

(g) In paragraph (g)(2)(ii) of the Allowable Cost and Payment--Facilities clause at FAR 52.216-13, the period of years may be increased to correspond with any statutory period of limitation applicable to claims of third parties against the contractor; provided, that a corresponding increase is made in the period for retention of records required in paragraph (f) of the clause at FAR 52.215-2, Audit and Records - Negotiation.

1816.307-70 NASA contract clauses.

(a) The contracting officer shall insert the clause at 1852.216-73, Estimated Cost and Cost Sharing, in each contract in which costs are shared by the contractor pursuant to 1816.303-70.

(b)The contracting officer shall insert the clause substantially as stated at 1852.216-74, Estimated Cost and Fixed Fee, in cost-plus-fixed-fee contracts.

(c) The contracting officer may insert the clause at 1852.216-75, Payment of Fixed Fee, in cost-plus-fixed-fee contracts. Modifications to the clause are authorized.

(d) The contracting officer shall insert the clause at 1852.216-81, Estimated Cost, in cost-no-fee contracts that are not cost sharing or facilities contracts.

(e) The contracting officer may insert a clause substantially as stated at 1852.216-87, Submission of Vouchers for Payment, in cost-reimbursement solicitations and contracts.

(f) When either FAR clause 52.216-7, Allowable Cost and Payment, or FAR clause 52.216-13, Allowable Cost and Payment---Facilities, is included in the contract, as prescribed at FAR 16.307(a) and (g), the contracting officer should include the clause at 1852.216-89, Assignment and Release Forms.

Subpart 1816.4--Incentive Contracts

1816.402 Application of predetermined, formula-type incentives.

When considering the use of a quality, performance, or schedule incentive, the following guidance applies.

(1) A positive incentive is generally not appropriate unless-

(i) Performance above the target (or minimum, if there are no negative incentives) level is of significant value to the Government;

(ii) The value of the higher level of performance is worth the additional cost/fee;

(iii) The attainment of the higher level of performance is clearly within the

control of the contractor; and

(iv) An upper limit is identified, beyond which no further incentive is earned.

(2) A negative incentive is generally not appropriate unless-

(i) A target level of performance can be established, which the contractor can reasonably be expected to reach with a diligent effort, but a lower level of performance is also minimally acceptable;

(ii) The value of the negative incentive is commensurate with the lower level of performance and any additional administrative costs; and

(iii) Factors likely to prevent attainment of the target level of performance are clearly within the control of the contractor.

(3) When a negative incentive is used, the contract must indicate a level below which performance is not acceptable.

1816.402-2 Performance incentives.

1816.402-270 NASA technical performance incentives.

(a) A performance incentive shall be included in all contracts based on performance-oriented documents (see FAR 11.101(a)) where the primary deliverable(s) is (are) hardware and where total value (including options) is greater than $25 million unless it is determined that the nature of the acquisition (for example, commercial off-the-shelf computers) would not effectively lend itself to a performance incentive. Any exception to this requirement shall be approved in writing by the Center Director. Performance incentives may be included in hardware contracts valued under $25 million at the discretion of the procurement officer. Performance incentives, which are objective and measure hardware performance after delivery and acceptance, are separate from other incentives, such as cost or delivery incentives.

(b) When a performance incentive is used, it shall be structured to be both positive and negative based on hardware performance after delivery and acceptance. In doing so, the contract shall establish a standard level of performance based on the salient hardware performance requirement. This standard performance level is normally the contract's minimum performance requirement. No incentive amount is earned at this standard performance level. Discrete units of measurement based on the same performance parameter shall be identified for performance both above and below the standard. Specific incentive amounts shall be associated with each performance level from maximum beneficial performance (maximum positive incentive) to minimal beneficial performance or total failure (maximum negative incentive). The relationship between any given incentive, both positive and negative, and its associated unit of measurement should reflect the value to the Government of that level of hardware performance. The contractor should not be rewarded for above-standard performance levels that are of no benefit to the Government.

(c) The final calculation of the performance incentive shall be done when hardware performance, as defined in the contract, ceases or when the maximum positive incentive is reached. When hardware performance ceases below the standard established in the contract, the Government shall calculate the amount due and the contractor shall pay the Government that amount. Once hardware performance exceeds the standard, the contractor may request payment of the incentive amount associated with a given level of performance, provided that such payments shall not be more frequent than monthly. When hardware performance ceases above the standard level of performance, or when the maximum positive incentive is reached, the Government shall calculate the final performance incentive earned and unpaid and promptly remit it to the contractor. The exclusion at FAR 16.405(e)(3) does not apply to decisions made as to the amount(s) of positive or negative incentive.

(d) When the deliverable hardware lends itself to multiple, meaningful measures of performance, multiple performance incentives may be established. When the contract requires the sequential delivery of several hardware items (e.g., multiple spacecraft), separate performance incentive structures may be established to parallel the sequential delivery and use of the deliverables.

(e) In determining the value of the maximum performance incentives available, the contracting officer shall follow the following rules.

(1) For a CPFF contract, the sum of the maximum positive performance incentive and fixed fee shall not exceed the limitations in FAR 15.404-4(c)(4)(i).

(2) For an award fee contract.

(i) The individual values of the maximum positive performance incentive and the total potential award fee (including any base fee) shall each be at least one-third of the total potential contract fee. The remaining one-third of the total potential contract fee may be divided between award fee and the maximum performance incentive at the discretion of the contracting officer.

(ii) The maximum negative performance incentive for research and development hardware (e.g., the first and second units) shall be equal in amount to the total earned award fee (including any base fee). The maximum negative performance incentives for production hardware (e.g., the third and all subsequent units of any hardware items) shall be equal in amount to the total potential award fee (including any base fee). Where one contract contains both cases described above, any base fee shall be allocated reasonably among the items.

(3) For cost reimbursement contracts other than award fee contracts, the maximum negative performance incentives shall not exceed the total earned fee under the contract.

1816.404 Fixed-price contracts with award fees.

Section 1816.405-2 applies to the use of FPAF contracts as if they were CPAF contracts. However, neither base fee (see 1816.405-271) nor evaluation of cost control (see 1816.405-274) apply to FPAF contracts.

1816.405 Cost-reimbursement incentive contracts.

1816.405-2 Cost-plus-award-fee (CPAF) contracts.

1816.405-270 CPAF contracts.

(a) Use of an award fee incentive shall be approved in writing by the procurement officer. The procurement officer's approval shall include a discussion of the other types of contracts considered and shall indicate why an award fee incentive is the appropriate choice. Award fee incentives should not be used on contracts with a total estimated cost and fee less than $2 million per year. The procurement officer may authorize use of award fee for lower-valued acquisitions, but should do so only in exceptional situations, such as contract requirements having direct health or safety impacts, where the judgmental assessment of the quality of contractor performance is critical.

(b) Except as provided in paragraph (c) of this section, an award fee incentive may be used in conjunction with other contract types for aspects of performance that cannot be objectively assessed. In such cases, the cost incentive is based on objective formulas inherent in the other contract types (e.g., FPI, CPIF), and the award fee provision should not separately incentivize cost performance.

(c) Award fee incentives shall not be used with a cost-plus-fixed-fee (CPFF) contract.

1816.405-271 Base fee.

(a) A base fee shall not be used on CPAF contracts for which the periodic award fee evaluations are final (1816.405-273(a)). In these circumstances, contractor performance during any award fee period is independent of and has no effect on subsequent performance periods or the final results at contract completion. For other contracts, such as those for hardware or software development, the procurement officer may authorize the use of a base fee not to exceed 3 percent. Base fee shall not be used when an award fee incentive is used in conjunction with another contract type (e.g., CPIF/AF).

(b) When a base fee is authorized for use in a CPAF contract, it shall be paid only if the final award fee evaluation is "satisfactory" or better. (See 1816.405-273 and 1816.405-275) Pending final evaluation, base fee may be paid during the life of the contract at defined intervals on a provisional basis. If the final award fee evaluation is "poor/unsatisfactory", all provisional base fee payments shall be refunded to the Government.

1816.405-272 Award fee evaluation periods.

(a) Award fee evaluation periods, including those for interim evaluations, should be at least 6 months in length. When appropriate, the procurement officer may authorize shorter evaluation periods after ensuring that the additional administrative costs associated with the shorter periods are offset by benefits accruing to the Government. Where practicable, such as developmental contracts with defined performance milestones (e.g., Preliminary Design Review, Critical Design Review, initial system test), establishing evaluation periods at conclusion of the milestones rather than calendar dates, or in combination with calendar dates should be considered. In no case shall an evaluation period be longer than 12 months.

(b) A portion of the total available award fee contract shall be allocated to each of the evaluation periods. This allocation may result in an equal or unequal distribution of fee among the periods. The contracting officer should consider the nature of each contract and the incentive effects of fee distribution in determining the appropriate allocation structure.

1816.405-273 Award fee evaluations.

(a) Service Contracts. On contracts where the contract deliverable is the performance of a service over any given time period, contractor performance is often definitively measurable within each evaluation period. In these cases, all evaluations are final, and the contractor keeps the fee earned in any period regardless of the evaluations of subsequent periods. Unearned award fee in any given period in a service contract is lost and shall not be carried forward, or "rolled-over," into subsequent periods.

(b) End Item Contracts. On contracts, such as those for end item deliverables, where the true quality of contractor performance cannot be measured until the end of the contract, only the last evaluation is final. At that point, the total contract award fee pool is available, and the contractor's total performance is evaluated against the award fee plan to determine total earned award fee. In addition to the final evaluation, interim evaluations are done to monitor performance prior to contract completion, provide feedback to the contractor on the Government's assessment of the quality of its performance, and establish the basis for making interim award fee payments (see 1816.405-276(a)). These interim evaluations and associated interim award fee payments are superseded by the fee determination made in the final evaluation at contract completion. The Government will then pay the contractor, or the contractor will refund to the Government, the difference between the final award fee determination and the cumulative interim fee payments.

(c) Control of evaluations. Interim and final evaluations may be used to provide past performance information during the source selection process in future acquisitions and should be marked and controlled as "Source Selection Information - See FAR 3.104".

1816.405-274 Award fee evaluation factors.

(a) Explicit evaluation factors shall be established for each award fee period.

(b) Evaluation factors will be developed by the contracting officer based upon the characteristics of an individual procurement. Normally, technical and schedule considerations will be included in all CPAF contracts as evaluation factors. Cost control shall be included as an evaluation factor in all CPAF contracts. When explicit evaluation factor weightings are used, cost control shall be no less than 25 percent of the total weighted evaluation factors. The predominant consideration of the cost control evaluation should be a measurement of the contractor's performance against the negotiated estimated cost of the contract. This estimated cost may include the value of undefinitized change orders when appropriate.

(c) In rare circumstances, contract costs may increase for reasons outside the contractor's control and for which the contractor is not entitled to an equitable adjustment. One example is a weather-related launch delay on a launch support contract. The Government shall take such situations into consideration when evaluating contractor cost control.

(d) Emphasis on cost control should be balanced against other performance requirement objectives. The contractor should not be incentivized to pursue cost control to the point that overall performance is significantly degraded. For example, incentivizing an underrun that results in direct negative impacts on technical performance, safety, or other critical contract objectives is both undesirable and counterproductive. Therefore, evaluation of cost control shall conform to the following guidelines:

(1) Normally, the contractor should be given a score of 0 for cost control when there is a significant overrun within its control. However, the contractor may receive higher scores for cost control if the overrun is insignificant. Scores should decrease sharply as the size of the overrun increases. In any evaluation of contractor overrun performance, the Government shall consider the reasons for the overrun and assess the extent and effectiveness of the contractor's efforts to control or mitigate the overrun.

(2) The contractor should normally be rewarded for an underrun within its control, up to the maximum score allocated for cost control, provided the average numerical rating for all other award fee evaluation factors is 81 or greater (see 1816.405-275). An underrun shall be rewarded as if the contractor has met the estimated cost of the contract (see 1816.405-274(d)(3)) when the average numerical rating for all other factors is less than 81 but greater than 60.

(3) The contractor should be rewarded for meeting the estimated cost of the contract, but not to the maximum score allocated for cost control, to the degree that the contractor has prudently managed costs while meeting contract requirements. No award shall be given in this circumstance unless the average numerical rating for all other award fee evaluation factors is 61 or greater.

(e) When an AF arrangement is used in conjunction with another contract type, the award fee's cost control factor will only apply to a subjective assessment of the contractor's efforts to control costs and not the actual cost outcome incentivized under the basic contract type (e.g. CPIF, FPIF).

(f) The contractor's performance against the subcontracting plan incorporated in the contract shall also be evaluated. Small disadvantaged business utilization may be an area of particular emphasis, including the contractor's achievements in subcontracting high technology efforts as well as the contractor's performance under the Mentor-Protégé Program, if applicable. The evaluation weight given to subcontracting plan performance should be significant (up to 15 percent of available award fee). It should motivate the contractor to focus management attention to subcontracting with small, small disadvantaged, and women-owned small business concerns to the maximum extent practicable consistent with efficient contract performance.

(g) Only the award fee performance evaluation factors set forth in the performance evaluation plan shall be used to determine award fee scores.

(h) The Government may unilaterally modify the applicable award fee performance evaluation factors and performance evaluation areas prior to the start of an evaluation period. The contracting officer shall notify the contractor in writing of any such changes 30 days prior to the start of the relevant evaluation period.

1816.405-275 Award fee evaluation scoring.

(a) A scoring system of 0-100 shall be used for all award fee ratings. Award fee earned is determined by applying the numerical score to the award fee pool. For example, a score of 85 yields an award fee of 85 percent of the award fee pool. No award fee shall be paid unless the total score is 61 or greater.

(b) The following standard adjectival ratings and the associated numerical scores shall be used on all award fee contracts.

(1) Excellent (100-91): Of exceptional merit; exemplary performance in a timely, efficient, and economical manner; very minor (if any) deficiencies with no adverse effect on overall performance.

(2) Very good (90-81): Very effective performance, fully responsive to contract requirements; contract requirements accomplished in a timely, efficient, and economical manner for the most part; only minor deficiencies.

(3) Good (80-71): Effective performance; fully responsive to contract requirements; reportable deficiencies, but with little identifiable effect on overall performance.

(4) Satisfactory (70-61): Meets or slightly exceeds minimum acceptable standards; adequate results; reportable deficiencies with identifiable, but not substantial, effects on overall performance.

(5) Poor/Unsatisfactory (less than 61): Does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; deficiencies in one or more areas which adversely affect overall performance.

(c) As a benchmark for evaluation, in order to be rated "Excellent," the contractor must be under cost, on or ahead of schedule, and have provided excellent technical performance.

(d) A scoring system appropriate for the circumstances of the individual contract requirement should be developed. Weighted scoring is recommended. In this system, each evaluation factor (e.g., technical, schedule, cost control) is assigned a specific percentage weighting with the cumulative weightings of all factors totaling 100. During the award fee evaluation, each factor is scored from 0-100 according to the ratings defined in 1816.405-275(b). The numerical score for each factor is then multiplied by the weighting for that factor to determine the weighted score. For example, if the technical factor has a weighting of 60 percent and the numerical score for that factor is 80, the weighted technical score is 48 (80 x 60 percent). The weighted scores for each evaluation factor are then added to determine the total award fee score.

1816.405-276 Award fee payments and limitations.

(a) Interim Award Fee Payments. The amount of an interim award fee payment (see 1816.405-273(b)) is limited to the lesser of the interim evaluation score or 80 percent of the fee allocated to that interim period less any provisional payments (see paragraph (b) of this subsection) made during the period.

(b) Provisional Award Fee Payments. Provisional award fee payments are payments made within evaluation periods prior to an interim or final evaluation for that period. Provisional payments may be included in the contract and should be negotiated on a case-by-case basis. For a service contract, the total amount of award fee available in an evaluation period that may be provisionally paid is the lesser of a percentage stipulated in the contract (but not exceeding 80 percent) or the prior period's evaluation score. For an end item contract, the total amount of provisional payments in a period is limited to a percentage not to exceed 80 percent of the prior interim period's evaluation score.

(c) Fee Payment. The Fee Determination Official's rating for both interim and final evaluations will be provided to the contractor within 45 calendar days of the end of the period being evaluated. Any fee, interim or final, due the contractor will be paid no later than 60 calendar days after the end of the period being evaluated.

1816.406 Contract clauses.

1816.406-70 NASA contract clauses.

(a) As authorized by FAR 16.406(e), the contracting officer shall insert the clause at 1852.216-76, Award Fee for Service Contracts, in solicitations and contracts when an award-fee contract is contemplated and the contract deliverable is the performance of a service.

(b) As authorized by FAR 16.406(e), the contracting officer shall insert the clause at 1852.216-77, Award Fee for End Item Contracts, in solicitations and contracts when an award fee contract is contemplated and the contract deliverables are hardware or other end items for which total contractor performance cannot be measured until the end of the contract. When the clause is used in a fixed-price award-fee contract, it shall be modified by deleting references to base fee in paragraphs (a), and by deleting paragraph (c)(1), the last sentence of (c)(4), and the first sentence of (c)(5).

(c) The contracting officer may insert a clause substantially as stated at 1852.216-83, Fixed Price Incentive, in fixed-price-incentive solicitations and contracts utilizing firm or successive targets. For items subject to incentive price revision, identify the target cost, target profit, target price, and ceiling price for each item.

(d) The contracting officer shall insert the clause at 1852.216-84, Estimated Cost and Incentive Fee, in cost-plus-incentive-fee solicitations and contracts.

(e) The contracting officer may insert the clause at 1852.216-85, Estimated Cost and Award Fee, in award-fee solicitations and contracts. When the contract includes performance incentives, use Alternate I. When the clause is used in a fixed-price award fee contract, it shall be modified to delete references to base fee and to reflect the contract type.

(f) As provided at 1816.402-270, the contracting officer shall insert a clause substantially as stated at 1852.216-88, Performance Incentive, when the primary deliverable(s) is (are) hardware and total estimated cost and fee is greater than $25 million. A clause substantially as stated at 1852.216-88 may be included in lower dollar value hardware contracts with the approval of the procurement officer.

Subpart 1816.5--Indefinite-Delivery Contracts

1816.504 Indefinite quantity contracts.

(a)(4)(ii) ID/IQ service contract values and task order values shall be expressed only in dollars.

1816.505 Ordering.

(a)(2) Task and delivery orders shall be issued by the contracting officer.

(b)(4) The Agency and installation ombudsmen designated in accordance with 1815.70 shall review complaints from contractors on task order contracts and delivery order contracts.

1816.505-70 Task ordering.

(a) The contracting officer shall, to the maximum extent possible, state task order requirements in terms of functions and the related performance and quality standards such that the standards may be objectively measured.

(b) To the maximum extent possible, contracting officers shall solicit contractor task plans to use as the basis for finalizing task order requirements and enable evaluation and pricing of the contractor's proposed work on a performance based approach as described in 1816.404-270(a).

(c) Task order contract type shall be individually determined, based on the nature of each task order's requirements.

(1) Task orders may be grouped by contract type for administrative convenience (e.g., all CPIF orders, all FFP orders, etc.) for contractor progress and cost reporting.

(2) Under multiple awards, solicitations for individual task plans shall request the same pricing structure from all offerors.

(d) Any undefinitized task order issued under paragraph (f) of the clause at 1852.216-80, Task Ordering Procedure, shall be treated and reported as an undefinitized contract action in accordance with 1843-70.

1816.506-70 NASA contract clause.

Insert the clause at 1852.216-80, Task Ordering Procedure, in solicitations and contracts when an indefinite-delivery, task order contract is contemplated. The clause is applicable to both fixed-price and cost-reimbursement type contracts. If the contract does not require 533M reporting (See NHB 9501.2), use the clause with its Alternate I.

Subpart 1816.6--Time-and-Materials, Labor-Hour, and Letter Contracts

1816.603 Letter contracts.

1816.603-370 Approvals.

(a) All requests for authority to issue a letter contract shall include the following:

(1) Proposed contractor's name and address.

(2) Location where contract is to be performed.

(3) Contract number, including modification number, if applicable.

(4) Brief description of the work or services to be performed.

(5) Performance period or delivery schedule.

(6) Amount of letter contract.

(7) Performance period of letter contract.

(8) Estimated total amount of definitive contract.

(9) Type of definitive contract to be executed.

(10) A statement that the definitive contract will contain all required clauses or identification of specific clause deviations that have been approved.

(11) A statement as to the necessity and advantage to the Government of the proposed letter contract.

(12) The definitization schedule described in FAR 16.603-2(c) expected to be negotiated with the contractor.

(b) Requests for authority to issue letter contracts having an estimated definitive contract amount equal to or greater than the Master Buy Plan submission thresholds of 1807.7101 (or modifications thereto) shall be signed by the procurement officer and submitted to the Associate Administrator for Procurement (Code HS) for approval.

(c) Authority to approve the issuance of letter contracts below the Master Buy Plan submission thresholds specified in 1807.7101 is delegated to the procurement officer.

(d) Any modification of an undefinitized letter contract approved by a procurement officer in accordance with paragraph (c) of this section that increases the estimated definitized contract amount to or above the Master Buy Plan submission thresholds must have the prior approval of the Associate Administrator for Procurement (Code HS).


of the concern. The existence of the ombudsman is not to diminish the authority of the contracting officer, the Source Evaluation Board, or the selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of formal contract disputes. Therefore, before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. If resolution cannot be made by the contracting officer, interested parties may contact the installation ombudsman, [Insert name], at [Insert telephone number]. Concerns, issues, disagreements, and recommendations which cannot be resolved at the installation may be referred to the NASA ombudsman, the Deputy Administrator for Procurement, at 202-358-2090. Please do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer or as specified elsewhere in this document.

(End of clause)

1852.216-73 Estimated Cost and Cost Sharing.

As prescribed in 1816.307-70(a), insert the following clause:

ESTIMATED COST AND COST SHARING

(DECEMBER 1991)

(a) It is estimated that the total cost of performing the work under this contract will be

$            .

(b) For performance of the work under this contract, the Contractor shall be reimbursed for not more than       percent of the costs of performance determined to be allowable under the Allowable Cost and Payment clause. The remaining       percent or more of the costs of performance so determined shall constitute the Contractor's share, for which it will not be reimbursed by the Government.

(c) For purposes of the        [insert "Limitation of Cost" or "Limitation of Funds"] clause, the total estimated cost to the Government is hereby established as $       (insert estimated Government share); this amount is the maximum Government liability.

(d) The Contractor shall maintain records of all contract costs claimed by the Contractor as constituting part of its share. Those records shall be subject to audit by the Government. Costs contributed by the Contractor shall not be charged to the Government under any other grant, contract, or agreement (including allocation to other grants, contracts, or agreements as part of an independent research and development program).

(End of clause)

1852.216-74 Estimated Cost and Fixed Fee.

As prescribed in 1816.307-70(b), insert the following clause:

ESTIMATED COST AND FIXED FEE

(DECEMBER 1991)

The estimated cost of this contract is           exclusive of the fixed fee of          . The total estimated cost and fixed fee is            .

(End of clause)

1852.216-75 Payment of Fixed Fee.

As prescribed in 1816.307-70(c), insert the following clause:

PAYMENT OF FIXED FEE

(DECEMBER 1988)

The fixed fee shall be paid in monthly installments based upon the percentage of completion of work as determined by the Contracting Officer.

(End of clause)

1852.216-76 Award Fee for Service Contracts.

As prescribed in 1816.406-70(a), insert the following clause:

AWARD FEE FOR SERVICE CONTRACTS

(MARCH 1998)

(a) The contractor can earn award fee from a minimum of zero dollars to the maximum stated in NASA FAR Supplement clause 1852.216-85, "Estimated Cost and Award Fee" in this contract.

(b) Beginning 6* months after the effective date of this contract, the Government shall evaluate the Contractor's performance every 6* months to determine the amount of award fee earned by the contractor during the period. The Contractor may submit a self-evaluation of performance for each evaluation period under consideration. These self-evaluations will be considered by the Government in its evaluation. The Government's Fee Determination Official (FDO) will determine the award fee amounts based on the Contractor's performance in accordance with [identify performance evaluation plan]. The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.

(c) The Government will advise the Contractor in writing of the evaluation results. The [insert payment office] will make payment based on [Insert method of authorizing award fee payment, e.g., issuance of unilateral modification by contracting officer].

(d) After 85 percent of the potential award fee has been paid, the Contracting Officer may direct the withholding of further payment of award fee until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government's interest. This reserve shall not exceed 15 percent of the total potential award fee.

(e) The amount of award fee which can be awarded in each evaluation period is limited to the amounts set forth at [identify location of award fee amounts]. Award fee which is not earned in an evaluation period cannot be reallocated to future evaluation periods.

(f)(1)Provisional award fee payments [insert "will" or "will not", as applicable] be made under this contract pending the determination of the amount of fee earned for an evaluation period. If applicable, provisional award fee payments will be made to the Contractor on a [insert the frequency of provisional payments (not more often than monthly)] basis. The total amount of award fee available in an evaluation period that will be provisionally paid is the lesser of [Insert a percent not to exceed 80 percent] or the prior period's evaluation score.

(2) Provisional award fee payments will be superseded by the final award fee evaluation for that period. If provisional payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the Contracting Officer.

(3) If the Contracting Officer determines that the Contractor will not achieve a level of performance commensurate with the provisional rate, payment of provisional award fee will be discontinued or reduced in such amounts as the Contracting Officer deems appropriate. The Contracting Officer will notify the Contractor in writing if it is determined that such discontinuance or reduction is appropriate. This determination is not subject to the Disputes clause.

(4) Provisional award fee payments [insert "will" or "will not", as appropriate] be made prior to the first award fee determination by the Government.

(g) Award fee determinations made by the Government under this contract are not subject to the Disputes clause.

*[A period of time greater or lesser than 6 months may be substituted in accordance with 1816.405-272(a).]

(End of clause)

1852.216-77 Award Fee for End Item Contracts.

As prescribed in 1816.406-70(b), insert the following clause:

AWARD FEE FOR END ITEM CONTRACTS

(JANUARY 1997)

(a) The contractor can earn award fee, or base fee, if any, from a minimum of zero dollars to the maximum stated in NASA FAR Supplement clause 1852.216-85, "Estimated Cost and Award Fee" in this contract. All award fee evaluations, with the exception of the last evaluation, will be interim evaluations. At the last evaluation, which is final, the Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is "poor/unsatisfactory."

(b) Beginning 6* months after the effective date of this contract, the Government will evaluate the Contractor's interim performance every 6* months to monitor Contractor performance prior to contract completion and to provide feedback to the Contractor. The evaluation will be performed in accordance with [identify performance evaluation plan] to this contract. The Contractor may submit a self-evaluation of performance for each period under consideration. These self-evaluations will be considered by the Government in its evaluation. The Government will advise the Contractor in writing of the evaluation results. The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.

(c) (1) Base fee, if applicable, will be paid in [Insert "monthly", or less frequent period] installments based on the percent of completion of the work as determined by the Contracting Officer.

(2) Interim award fee payments will be made to the Contractor based on each interim evaluation. The amount of the interim award fee payment is limited to the lesser of the interim evaluation score or 80 percent of the fee allocated to that period less any provisional payments made during the period. All interim award fee payments will be superseded by the final award fee determination.

(3) Provisional award fee payments will [insert "not" if applicable] be made under this contract pending each interim evaluation. If applicable, provisional award fee payments will be made to the Contractor on a [insert the frequency of provisional payments (not more often than monthly)] basis. The amount of award fee which will be provisionally paid in each evaluation period is limited to [Insert a percent not to exceed 80 percent] of the prior interim evaluation score (see [insert applicable cite]). Provisional award fee payments made each evaluation period will be superseded by the interim award fee evaluation for that period. If provisional payments made exceed the interim evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the Contracting Officer. If the Government determines that (i) the total amount of provisional fee payments will apparently substantially exceed the anticipated final evaluation score, or (ii) the prior interim evaluation is "poor/unsatisfactory," the Contracting Officer will direct the suspension or reduction of the future payments and/or request a prompt refund of excess payments as appropriate. Written notification of the determination will be provided to the Contractor with a copy to the Deputy Chief Financial Officer (Finance). This determination is not subject to the Disputes clause.

(4) All interim (and provisional, if applicable) fee payments will be superseded by the fee determination made in the final award fee evaluation. The Government will then pay the Contractor, or the Contractor will refund to the Government the difference between the final award fee determination and the cumulative interim (and provisional, if applicable) fee payments. If the final award fee evaluation is "poor/unsatisfactory", any base fee paid will be refunded to the Government.

(5) Payment of base fee, if applicable, will be made based on submission of an invoice by the Contractor. Payment of award fee will be made by the [insert payment office] based on [Insert method of making award fee payment, e.g., issuance of a unilateral modification by the Contracting Officer].

(d) Award fee determinations made by the Government under this contract are not subject to the Disputes clause.

*[A period of time greater or lesser than 6 months may be substituted in accordance with 1816.405-272(a).]

(End of clause)

1852.216-78  Firm Fixed Price.

As prescribed in 1816.202-70, insert the following clause:

FIRM FIXED PRICE

(DECEMBER 1988)

The total firm fixed price of this contract is $[Insert the appropriate amount].

(End of clause)

1852.216-80 Task Ordering Procedure.

As prescribed in 1816.506-70, insert the following clause:

TASK ORDERING PROCEDURE

(OCTOBER 1996)

(a) Only the Contracting Officer may issue task orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the schedule. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this clause. No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.

(b) Prior to issuing a task order, the Contracting Officer shall provide the Contractor with the following data:

(1) A functional description of the work identifying the objectives or results desired from the contemplated task order.

(2) Proposed performance standards to be used as criteria for determining whether the work requirements have been met.

(3) A request for a task plan from the Contractor to include the technical approach, period of performance, appropriate cost information, and any other information required to determine the reasonableness of the Contractor's proposal.

(c) Within ____ calendar days after receipt of the Contracting Officer's request, the Contractor shall submit a task plan conforming to the request.

(d) After review and any necessary discussions, the Contracting Officer may issue a task order to the Contractor containing, as a minimum, the following:

(1) Date of the order.

(2) Contract number and order number.

(3) Functional description of the work identifying the objectives or results desired from the task order, including special instructions or other information necessary for performance of the task.

(4) Performance standards, and where appropriate, quality assurance standards.

(5) Maximum dollar amount authorized (cost and fee or price). This includes allocation of award fee among award fee periods, if applicable.

(6) Any other resources (travel, materials, equipment, facilities, etc.) authorized.

(7) Delivery/performance schedule including start and end dates.

(8) If contract funding is by individual task order, accounting and appropriation data.

(e) The Contractor shall provide acknowledgment of receipt to the Contracting Officer within ____ calendar days after receipt of the task order.

(f) If time constraints do not permit issuance of a fully defined task order in accordance with the procedures described in paragraphs (a) through (d), a task order which includes a ceiling price may be issued.

(g) The Contracting Officer may amend tasks in the same manner in which they were issued.

(h) In the event of a conflict between the requirements of the task order and the Contractor's approved task plan, the task order shall prevail.

(End of clause)

ALTERNATE I

(OCTOBER 1996)

As prescribed in 1816.506-70, insert the following paragraph (i) if the contract does not include 533M reporting:

(i) Contractor shall submit monthly task order progress reports. As a minimum, the reports shall contain the following information:

(1) Contract number, task order number, and date of the order.

(2) Task ceiling price.

(3) Cost and hours incurred to date for each issued task.

(4) Costs and hours estimated to complete each issued task.

(5) Significant issues/problems associated with a task.

(6) Cost summary of the status of all tasks issued under the contract.

1852.216-81  Estimated Cost.

As prescribed in 1816.307-70(d), insert the following clause:

ESTIMATED COST

(DECEMBER 1988)

The total estimated cost for complete performance of this contract is $[Insert total estimated cost of the contract]. See FAR clause 52.216-11, Cost Contract--No Fee, of this contract.

(End of clause)

1852.216-83 Fixed Price Incentive.

As prescribed in 1816.406-70(c), insert the following clause:

FIXED PRICE INCENTIVE

(OCTOBER 1996)

The target cost of this contract is $      . The Target profit of this contract is $      . The target price (target cost plus target profit) of this contract is $      . [The ceiling price is $      .]

The cost sharing for target cost underruns is:

Government ____percent Contractor ____percent.

The cost sharing for target cost overruns is:

Government ____percent Contractor ____percent.

(End of clause)

1852.216-84 Estimated Cost and Incentive Fee.

As prescribed in 1816.406-70(d), insert the following clause:

ESTIMATED COST AND INCENTIVE FEE

(OCTOBER 1996)

The target cost of this contract is $     . The target fee of this contract is $     . The total target cost and target fee as contemplated by the Incentive Fee clause of this contract are $     .

The maximum fee is $____.

The minimum fee is $____.

The cost sharing for cost underruns is:

Government ____percent Contractor ____percent.

The cost sharing for cost overruns is:

Government ____percent Contractor ____percent.

(End of clause)

1852.216-85 Estimated Cost and Award Fee.

As prescribed in 1816.406-70(e), insert the following clause:

ESTIMATED COST AND AWARD FEE

(SEPTEMBER 1993)

The estimated cost of this contract is $      . The maximum available award fee, excluding base fee, if any, is $     . The base fee is $ . Total estimated cost, base fee, and maximum award fee are $     .

(End of clause)

ALTERNATE I

(SEPTEMBER 1993)

As prescribed in 1816.406-70(e), insert the following sentence at the end of the clause:

The maximum positive performance incentive is $ . The maximum negative performance incentive is (1) .

(1) For research development hardware contracts, insert [equal to total earned award fee (including any base fee)]. For production hardware contracts, insert [$total potential award fee amount, including any base fee)].

(End of clause)

1852.216-87 Submission of Vouchers for Payment.

As prescribed in 1816.307-70(e), insert the following clause:

SUBMISSION OF VOUCHERS FOR PAYMENT

(OCTOBER 1997)

(a) Public vouchers for payment of costs shall include a reference to this contract [Insert the contract number] and be forwarded to:

[Insert the mailing address for submission of cost vouchers.]

This is the designated billing office for cost vouchers for purposes of the Prompt Payment clause of this contract.

(b) The Contractor shall prepare vouchers as follows:

(1) One original Standard Form (SF) 1034, SF 1035, or equivalent Contractor's attachment.

(2) Seven copies of SF 1034A, SF 1035A, or equivalent Contractor's attachment.

(3) The Contractor shall mark SF 1034A copies 1, 2, 3, 4, and such other copies as may be directed by the Contracting Officer by insertion in the memorandum block the names and addresses as follows:

(i) Copy 1 NASA Contracting Officer;

(ii) Copy 2 Auditor;

(iii) Copy 3 Contractor;

(iv) Copy 4 Contract administration office; and

(v) Copy 5 Project management office.

(4) For any period that the Defense Contract Audit Agency has authorized the Contractor to submit interim vouchers directly to the Government paying office, interim vouchers are not required to be sent to the Auditor, and are considered to be provisionally approved for payment, subject to final audit.

(c) Public vouchers for payment of fee shall be prepared similarly and be forwarded to:

[Insert the mailing address for submission of fee vouchers.]

This is the designated billing office for fee vouchers for purposes of the Prompt Payment clause of this contract.

(d) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate voucher for the amount withheld will be required before payment for that amount may be made.

1852.216-88 Performance Incentive.

As prescribed in 1816.406-70(f), insert the following clause:

PERFORMANCE INCENTIVE

(JANUARY 1997)

(a) A performance incentive applies to the following hardware item(s) delivered under this contract: (1)

The performance incentive will measure the performance of those items against the salient hardware performance requirement, called "unit(s) of measurement," e.g., months in service or amount of data transmitted, identified below. The performance incentive becomes effective when the hardware is put into service. It includes a standard performance level, a positive incentive, and a negative incentive, which are described in this clause.

(b) Standard performance level. At the standard performance level, the Contractor has met the contract requirement for the unit of measurement. Neither positive nor negative incentives apply when this level is achieved but not exceeded. The standard performance level for (1) is established as follows: (2)

(c) Positive incentive. The Contractor earns a separate positive incentive amount for each hardware item listed in paragraph (a) of this clause when the standard performance level for that item is exceeded. The amount earned for each item varies with the units of measurement achieved, up to a maximum positive performance incentive amount of $ (3) per item. The units of measurement and the incentive amounts associated with achieving each unit are shown below: (4)

(d) Negative incentive. The Contractor will pay to the Government a negative incentive amount for each hardware item that fails to achieve the standard performance level. The amount to be paid for each item varies with the units of measurement achieved, up to the maximum negative incentive amount of $ (5) . The units of measurement and the incentive amounts associated with achieving each unit are shown below: (6)

(e) The final calculation of positive or negative performance incentive amounts shall be done when performance (as defined by the unit of measurement) ceases or when the maximum positive incentive is reached.

(1) When the Contracting Officer determines that the performance level achieved fell below the standard performance level, the Contractor will either pay the amount due the Government or credit the next payment voucher for the amount due, as directed by the Contracting Officer.

(2) When the performance level exceeds the standard level, the Contractor may request payment of the incentive amount associated with a given level of performance, provided that such payments shall not be more frequent than monthly. When performance ceases or the maximum positive incentive is reached, the Government shall calculate the final performance incentive earned and unpaid and promptly remit it to the contractor.

(f) If performance cannot be demonstrated, through no fault of the Contractor, within [insert number of months or years] after the date of hardware acceptance by the Government, the Contractor will be paid [insert percentage] of the maximum performance incentive.

(g) The decisions made as to the amount(s) of positive or negative incentives are subject to the Disputes clause.

(1) Insert applicable item number(s) and/or nomenclature.

(2) Insert a specific unit of measurement for each hardware item listed in (1) and each salient characteristic, if more than one.

(3) Insert the maximum positive performance incentive amount (see 1816.402-270(e)(1) and (2)).

(4) Insert all units of measurement and associated dollar amounts up to the maximum performance incentive.

(5) Insert the appropriate amount in accordance with 1816.402-270(e).

(6) Insert all units of measurement and associated dollar amounts up to the maximum negative performance incentive.

(End of clause)

1852.216-89 Assignment and Release Forms.

As prescribed in 1816.307-70(f), insert the following clause:

ASSIGNMENT AND RELEASE FORMS

(JULY 1997)

The Contractor shall use the following forms to fulfill the assignment and release requirements of FAR clause 52.216-7, Allowable Cost and Payment, and FAR clause 52.216-13, Allowable Cost and Payment (Facilities):

NASA Form 778, Contractor's Release;

NASA Form 779, Assignee's Release;

NASA Form 780, Contractor's Assignment of Refunds, Rebates, Credits, and Other Amounts; and

NASA Form 781, Assignee's Assignment of Refunds, Rebates, Credits, and Other Amounts.

Computer generated forms are acceptable, provided that they comply with FAR clause 52.253-1, Computer Generated Forms.

(End of clause)